- Xref: sparky sci.environment:14129 sci.energy:6523
- Newsgroups: sci.environment,sci.energy
- Path: sparky!uunet!elroy.jpl.nasa.gov!usc!wupost!emory!rsiatl!jgd
- From: jgd@dixie.com (John De Armond)
- Subject: Re: Nuclear Power and Climate Change
- Message-ID: <p2qrxnc@dixie.com>
- Date: Thu, 31 Dec 92 04:36:39 GMT
- Organization: Dixie Communications Public Access. The Mouth of the South.
- References: <1992Dec30.161607.25113@vexcel.com>
- Lines: 85
-
- dean@vexcel.com (Dean Alaska) writes:
-
-
- >It seems to be a common conception that nuclear power is a good response
- >to any possible climate change problem. I have challenged this assumption
- >before but I will address in more detail here.
-
- > Capital cost: $1000/installed kW
- > Generation cost: $.05/kWh
- > Plant construction period: 6 years
- > Capacity factor: 65%
- > Lifetime: 30 years
-
- > No costs for decommissioning, waste, health impacts or political
- > problems are included
-
- Without even addressing the splintered logic involved in the "less is
- more", "conservation is generating capacity" line of reasoning, the
- above numbers are enough to destroy the credibility of the report.
- Let's look at a few of them.
-
- First capital cost: If we postulate a scenario where the US
- commits to an all-out conversion to nuclear energy, it must
- also be postulated that things that need to be done to
- streamline the process will be done. Things such as generic
- type-accepted packaged units, less complex fault-tolerant
- reactor designs, one stop licensing, putting the intervenors
- back out on the street where they belong and so on. To suggest
- that a plant would cost $1000/iKW is grossly dishonest. One
- can examine the closest thing the US has had to a type-accepted
- design was the GE turnkey BTRs of the MkII generation. Browns
- Ferry is an example. A very good example since the first two units
- were about the last built before the nuclear hysteria sent
- costs to the stratosphere. Units I and II were built for a total
- cost of about $250 million. At a MW capacity of about 1000 MWE each,
- that puts the cost at about $250/iKW. Technology advancements can
- comfortably be assumed to offset inflation over the period.
-
- Next, plant construction interval. The japanese have routinely built
- conventional LWR plants in 3 years. A reasonable estimate for a plant
- of modest complexity.
-
- Next, availability. The industry standard of performance for present
- day reactors is "outage to outage" availability. That is, pull the
- rods and run til the fuel runs out. A one month outage every 18 months
- gives an availability of 94%. High burnup fuel addressing the goal of
- extending the fueling cycle beyond 18 months is a current industry
- goal. It is reasonable to assume that an optimized reactor designed
- for widespread deployment would have the ability to refuel on-line.
- The secondary plant would still need an outage every few years for
- turbine overhaul and so on.
-
- Beyond that, an optimal design would have multiple fractional capacity
- reactors feeding multiple turbines in a matrix. This would permit
- the plant to remain online at reduced capacity if one reactor must be
- shut down AND would permit the shutdown of one turbine for maintenance
- while the other ran at reduced output.
-
- Using an availability of 65% in an analysis borders on fraud.
-
- Lastly, lifetime. The design life for present day power plants is 40 years.
- Few people in the industry believe a plant will be turned off and
- decommissioned at the end of 40 years. Conventional practice will be followed
- in most cases in which incremental improvements are made continuously and
- periodically major overhauls are done. TVA (the utility I'm most
- familiar with) has fossil units almost 100 years old. There is nothing
- there other than some of the concrete that is actually 100 years old.
-
- Consider again Browns Ferry. It is approaching 25 years old. There is
- not ever a consideration of shutting down the plant in 5 years. I was
- down for several years for a practically complete overhaul in the late
- 80s. It probably has another 20 or 30 years before another overhaul
- will be needed. I think a 50 year lifetime would be a conservative
- planning estimate. A 30 year estimate is silly.
-
- I'll let others take shots at the rest of the "study". I've seen enough
- in just this little chunk to discredit it.
-
- john
- --
- John De Armond, WD4OQC |Interested in high performance mobility?
- Performance Engineering Magazine(TM) | Interested in high tech and computers?
- Marietta, Ga | Send ur snail-mail address to
- jgd@dixie.com | perform@dixie.com for a free sample mag
- Need Usenet public Access in Atlanta? Write Me for info on Dixie.com.
-