home *** CD-ROM | disk | FTP | other *** search
/ Programmer 7500 / MAX_PROGRAMMERS.iso / CLIPPER / MISC / AIE9002.ZIP / REGINBOX.EXE / REGINBOX.MAG < prev    next >
Encoding:
Text File  |  1989-05-17  |  178.6 KB  |  39 lines

  1.  
  2.     This file is a special BLACK MAGIC Hypertext document.  To read me
  3. obtain MAGREAD.ARC from a local bulletin board, free of charge, or
  4. send $7 to: 
  5.  
  6.     NTERGAID
  7.     2490 BLACK ROCK TPK SUITE 337
  8.     FAIRFIELD, CT 06840
  9.  
  10. to receive, a disk copy of MAGREAD.ARC.
  11. You'll also get some of the latest documents written with BLACK MAGIC.
  12.  
  13.             Thank You
  14.             NTERGAID, Inc.
  15.            ////////////////////A    O////////////////////JOO////////////////////LOO////////////////////OO
  16. O////////////////////RO    O////////////////////VOO////////////////////YOO////////////////////^OO////////////////////aOO////////////////////q OO////////////////////} OO////////////////////êYOO////////////////////ß%OO////////////////////OO////////////////////$    OO////////////////////-OO////////////////////@OO////////////////////FOO////////////////////_OO////////////////////uOO////////////////////îOO////////////////////ñOO////////////////////╜XOO////////////////////OO////////////////////OO////////////////////# OO/////////////////////OO////////////////////4OO////////////////////HOO////////////////////XOO////////////////////\OO////////////////////bOO////////////////////uOO////////////////////éOO////////////////////â OO////////////////////ÅOO////////////////////¿ OO////////////////////┤OO////////////////////─OO////////////////////╒
  17. OO////////////////////▀OO////////////////////πOO////////////////////Θ22////////////////////Ω
  18. 22////////////////////∞
  19. <<////////////////////φ
  20. <<.20(a)///////////∩<<////////////////////≤//////////////////////⌠<<////////////////////°<<////////////////////ⁿ22////////////////////■<<//////////////////// <<////////////////////<<////////////////////    <<////////////////////
  21. <<//////////////////// NN////////////////////////////////////////<<////////////////////<<////////////////////<<////////////////////<<//////////////////// <<////////////////////<<//////////////////// <<////////////////////" <<////////////////////%<<////////////////////&22////////////////////'<<////////////////////+<</////////////////////<<////////////////////3<<////////////////////4<<////////////////////6    <<////////////////////877////////////////////;    <<////////////////////><<////////////////////?<<////////////////////C<<////////////////////H<<////////////////////M<<////////////////////Q<<////////////////////S 77////////////////////V<<////////////////////WHH////////////////////]<<////////////////////` <<////////////////////cFF////////////////////jFF////////////////////p////////////////////q////////////////////r////////////////////s////////////////////t////////////////////u////////////////////v22////////////////////x
  22. OO////////////////////éOO////////////////////ö////////////////////ò77////////////////////ù<<////////////////////Ö <<////////////////////£<<////////////////////₧ <<////////////////////í<<////////////////////ú<<////////////////////Ñ<<////////////////////¿<<////////////////////¬<<////////////////////»<<////////////////////│<<////////////////////╢FF////////////////////╜<<////////////////////┐<<////////////////////─22////////////////////╞<<////////////////////╚<<////////////////////╦<<////////////////////╠<<////////////////////═<<////////////////////╙77////////////////////╫////////////////////╪::////////////////////▐FF////////////////////Σ<<////////////////////Θ    88////////////////////∞77////////////////////ε77////////////////////≡77////////////////////⌠77////////////////////÷77////////////////////∙ <<////////////////////ⁿ    <<////////////////////■    <<////////////////////77////////////////////44////////////////////<<////////////////////
  23. 88////////////////////lOO////////////////////zOO////////////////////////////////////////Ç////////////////////ü NN////////////////////é<<////////////////////ä<<////////////////////å<<////////////////////ï<<////////////////////î<<////////////////////Å <<////////////////////ô<<////////////////////ö<<////////////////////ù    <<////////////////////Ü<<////////////////////¢<<////////////////////í<<////////////////////ñ<<////////////////////ª<<////////////////////¿<<////////////////////»<<////////////////////▓ <<////////////////////╢<<////////////////////╕<<////////////////////║
  24. <<////////////////////╛
  25. <<////////////////////┬<<////////////////////─<<////////////////////╟
  26. <<////////////////////╦<<////////////////////═<<////////////////////╧<<////////////////////╤<<////////////////////╥<<////////////////////╘<<////////////////////╓<<////////////////////╫<<////////////////////┘
  27. <<////////////////////▌<<////////////////////α<<////////////////////π<<////////////////////Σ<<////////////////////µ<<////////////////////φ<<////////////////////∩<<////////////////////≥<<////////////////////⌡<<////////////////////÷<<////////////////////≈
  28. <<////////////////////√ <<//////////////////// <<////////////////////<<////////////////////<<////////////////////<<////////////////////KK////////////////////<<////////////////////<<////////////////////<<////////////////////NO////////////////////////////////////////NO////////////////////<<////////////////////"////////////////////#77////////////////////%22////////////////////'////////////////////(////////////////////)////////////////////*NO////////////////////+////////////////////,////////////////////-///////////////////.KK////////////////////6OF////////////////////<22////////////////////=22////////////////////>22////////////////////?22////////////////////@22////////////////////A22////////////////////B 22////////////////////E22////////////////////F22////////////////////G    22////////////////////H22////////////////////I22////////////////////J
  29. 22////////////////////K 22////////////////////L22////////////////////T<<////////////////////U    22////////////////////V
  30. 22////////////////////W 22////////////////////X22////////////////////Y    22////////////////////[<<////////////////////\22////////////////////a77////////////////////c--////////////////////d--////////////////////eFF////////////////////k////////////////////l////////////////////m////////////////////nOO////////////////////pOO////////////////////üOO////////////////////ä OO////////////////////É<<ur StateUST agency :  
  31. ⌠y
  32.                            REG-IN-A-BOX1.1             OfficeofUndergroundStorageTanks,U.S.E.P.A                        ╙Readthisbeforeusing      «    │        &PART 280TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST)  Subpart AProgram Scope and Interim Prohibition Subpart BUST Systems:  Design, Construction, Installation and Notification Subpart CGeneral Operating Requirements Subpart DRelease Detection Subpart ERelease Reporting, Investigation, and Confirmation Subpart FRelease Response and Corrective Action for UST Systems Containing Petroleum or Hazardous Substances Subpart GOut-of-Service UST Systems and Closure :SubpartHFinancialResponsibility  ≤Appendix 1 Notification for Underground Storage Tanks (Form) ïºAppendix 2 List of Agencies î¿Appendix 3 Statement for Shipping Tickets and Invoices  ╠TELEPHONEDIRECTORY ÷HELP╘8FAMILYTREE r      Subpart AProgram Scope and Interim Prohibition Sec.      280.10  Applicability. 
  33.     280.11  Interim Prohibition for deferred UST systems. 
  34. 280.12  Definitions.               ÷0HELP y      Subpart BUST Systems:  Design, Construction, Installation and Notification Sec.   280.20  Performance standards for new UST systems.  280.21  Upgrading of existing UST systems. 280.22  Notification requirements.               ÷1HELP (      Subpart CGeneral Operating Requirements Sec.  280.30  Spill and overfill control. 280.31  Operation and maintenance of corrosion protection. 280.32  Compatibility. 280.33  Repairs allowed. 280.34  Reporting and recordkeeping.             ÷2HELP (      Subpart DRelease Detection Sec.  280.40  General requirements for all UST systems. 280.41  Requirements for petroleum UST systems. 280.42  Requirements for hazardous substance UST systems. 280.43  Methods of release detection for tanks. a≤280.44  Methods of release detection for piping. 280.45  Release detection recordkeeping.            ÷3HELP  E      Subpart ERelease Reporting, Investigation, and Confirmation
  35.  Sec.  280.50  Reporting of suspected releases. 280.51  Investigation due to off-site impacts. 280.52  Release investigation and confirmation steps. 280.53  Reporting and cleanup of spills and overfills.              ÷4HELP p      Subpart FRelease Response and Corrective Action for UST Systems Containing Petroleum or Hazardous Substances Sec.  280.60  General. 280.61  Initial response.  280.62  Initial abatement measures and site check. ! 280.63  Initial site characterization. b⌡280.64  Free product removal. #"280.65  Investigations for soil and groundwater cleanup. $#280.66  Corrective action plan. %$280.67  Public participation.         ÷5HELP        Subpart  GOut-of-Service UST Systems and Closure  &%280.70  Temporary closure. '&    ₧    ƒ280.71    ₧    ƒ  Permanent closure and changes-in-service. ('    á280.72    á  Assessing the site at closure or change-in-service. )(280.73  Applicability to previously closed UST systems. *)280.74  Closure records.              ÷6HELP w        ░    ╝280.10  Applicability.  ZApplicabilityAdvisor  (a)  The requirements of this Part apply to all owners and operators of      an UST system as defined in `280.12 except as otherwise provided in      paragraphs (b), (c), and (d) of this section.  Any UST system listed in      paragraph (c) of this section must meet the requirements of 
  36. ,280.11.      à    ╖        (    9(b)    à  The following UST systems are excluded from the requirements of this      Part:       (1)  Any UST system holding hazardous wastes listed or identified under      Subtitle C of the Solid Waste Disposal Act, or a mixture of such      hazardous waste and other regulated substances.  (2)  Any wastewater treatment tank system that is part of a wastewater      treatment facility regulated under Section 402 or 307(b) of the Clean      Water Act.  (3)  Equipment or machinery that contains regulated substances for      operational purposes such as hydraulic lift tanks and electrical      equipment tanks.  (4)  Any UST system whose capacity is 110 gallons or less.  (5)  Any UST system that contains a de minimis concentration of regulated      substances.  (6)  Any emergency spill or overflow containment UST system that is      expeditiously emptied after use.      *    +    -(c)    -  Deferrals.  Subparts B, C, D, E, and G do not apply to any of the      following types of UST systems:  (1)  Wastewater treatment tank systems;  (2)  Any UST systems containing radioactive material that are regulated      under the Atomic Energy Act of 1954 (42 USC 2011 and following);  (3)  Any UST system that is part of an emergency generator system at      nuclear power generation facilities regulated by the Nuclear Regulatory      Commission under 10 CFR 50 Appendix A;  (4)  Airport hydrant fuel distribution systems; and  (5)  UST systems with field-constructed tanks.  (d)  Deferrals.  Subpart D does not apply to any UST system that stores      fuel solely for use by emergency power generators.              ,    ╜280.11    ,  Interim Prohibition for deferred UST systems.  cApplicabilityAdvisor  (a)  No person may install an UST system listed in    -280.10(c)for the      purpose of storing regulated substances unless the UST system (whether of      single- or double-wall construction):  (1)  Will prevent releases due to corrosion or structural failure for the      operational life of the UST system;  (2)  Is cathodically protected against corrosion, constructed of      noncorrodible material, steel clad with a noncorrodible material, or      designed in a manner to prevent the release or threatened release of any      stored substance; and  (3)  Is constructed or lined with material that is compatible with the      stored substance.  (b)  Notwithstanding paragraph (a) of this section, an UST system without      corrosion protection may be installed at a site that is determined by a      corrosion expert not to be corrosive enough to cause it to have a release      due to corrosion during its operating life.  Owners and operators must      maintain records that demonstrate compliance with the requirements of      this paragraph for the remaining life of the tank.       [Note:  The National Association of Corrosion Engineers Standard      RP-02-85, Control of External Corrosion on Metallic Buried, Partially      Buried, or Submerged Liquid Storage Systems, may be used as guidance for      complying with paragraph (b) of this section.]  s    
  37.     280.12  Definitions.  æAncillaryequipment ÆBelowgroundrelease ôBeneaththesurfaceoftheground öCathodicprotection òCathodicprotectiontester ûCERCLA ùCompatible ÿConnectedpiping ÖConsumptiveuse ÜCorrosionexpert ¢Dielectricmaterial £Electricalequipment ¥Excavationzone ₧Existingtanksystem ƒFarmtank áFlow-throughprocesstank íFreeproduct óGatheringlines úHazardoussubstanceUSTsystem ñHeatingoil ÑHydrauliclifttank ªImplementingagency ºLiquidtrap ¿Maintenance ⌐Motorfuel ¬Newtanksystem ½Noncommercialpurposes ¼Onthepremiseswherestored ¡Operationallife «Operator »Overfillrelease ░Owner ▒Person ▓PetroleumUSTsystem │PipeorPiping ┤Pipeline facilities (including gathering lines) ╡Regulatedsubstance ╢Release ╖Releasedetection ╕Repair ╣Residentialtank ║SARA ╗Septictank ╝Storm-waterorwastewatercollectionsystem ╜Surfaceimpoundment ╛Tank ┐Undergroundarea └Undergroundrelease ┴UndergroundstoragetankorUST ┬Upgrade ├USTsystemorTanksystem ─Wastewatertreatmenttank    n         3    a    f    £    ╟    ╚    ▀    µ    τ    Θ    Ω    ∞    φ    ε    ≡280.20    3    a    f    £  Performance standards for new UST systems.       In order to prevent releases due to structural failure,  corrosion, or      spills and overfills for as long as the UST system is used to store      regulated substances, all owners and operators of new UST systems must      meet the following requirements.  /Explain280.20(a)     6    :    ?    I    ┼    ╞    ▐    δ(a)    6    :    ?    I  Tanks.  Each tank must be properly designed and constructed, and any      portion underground that routinely contains product must be protected      from corrosion, in accordance with a code of practice developed by a      nationally recognized association or independent testing laboratory as      specified below:  (1)  The tank is constructed of fiberglass-reinforced plastic; or       [Note:  The following industry codes may be used to comply with paragraph      (a)(1) of this section:  Underwriters Laboratories Standard 1316,      Standard for Glass-Fiber-Reinforced Plastic Underground Storage Tanks      for Petroleum Products; Underwriters Laboratories of Canada CAN4-S615-      M83, Standard for Reinforced Plastic Underground Tanks for Petroleum      Products; or American Society of Testing and Materials Standard D4021-      86, Standard Specification for Glass-Fiber-Reinforced Polyester      Underground Petroleum Storage Tanks.]  (2)  The tank is constructed of  steel and cathodically protected in the      following manner:  (i)  The tank is coated with a suitable dielectric material;  (ii)  Field-installed cathodic protection systems are designed by a       corrosion expert;  (iii)  Impressed current systems are designed to allow determination of        current operating status as required in .280.31(c); and  (iv)  Cathodic protection systems are operated and maintained in       accordance with /280.31 or according to guidelines established by the       implementing agency; or       [Note:  The following codes and standards may be used to comply with      paragraph (a)(2) of this section:  (A)  Steel Tank Institute Specification for STI-P3 System of External      Corrosion Protection of Underground Steel Storage Tanks;  (B)  Underwriters Laboratories Standard 1746, Corrosion Protection      Systems for Underground Storage Tanks;  (C)  Underwriters Laboratories of Canada CAN4-S603-M85, Standard for      Steel Underground Tanks for Flammable and Combustible Liquids, and CAN4-      G03.1-M85, Standard for Galvanic Corrosion Protection Systems for      Underground Tanks for Flammable and Combustible Liquids, and CAN4-S631-      M84, Isolating Bushings for Steel Underground Tanks Protected with      Coatings and Galvanic Systems; or  (D)  National Association of Corrosion Engineers Standard RP-02-85,      Control of External Corrosion on Metallic Buried, Partially Buried, or      Submerged Liquid Storage Systems, and Underwriters Laboratories Standard      58, Standard for Steel Underground Tanks for Flammable and Combustible      Liquids.]  (3)  The tank is constructed of a steel-fiberglass-reinforced-plastic      composite; or       [Note:  The following industry codes may be used to comply with paragraph      (a)(3) of this section:  Underwriters Laboratories Standard 1746,      Corrosion Protection Systems for Underground Storage Tanks, or the      Association for Composite Tanks ACT-100, Specification for the      Fabrication of FRP Clad Underground Storage Tanks.]  (4)  The tank is constructed of metal without additional corrosion      protection measures provided that:  (i)  The tank is installed at a site that is determined by a corrosion      expert not to be corrosive enough to cause it to have a release due to      corrosion during its operating life; and  (ii) Owners and operators maintain records that demonstrate compliance       with the requirements of paragraph (a)(4)(i) of this section for the      remaining life of the tank; or  (5)  The tank construction and corrosion protection are determined by the      implementing agency to be designed to prevent the release or threatened      release of any stored regulated substance in a manner that is no less      protective of human health and the environment than paragraphs (a)(1)      through (4) of this section.  1Explain280.20(b)     ;    <(b)    ;    <  Piping.  The piping that routinely contains regulated substances and      is in contact with the ground must be properly designed, constructed, and      protected from corrosion in accordance with a code of practice developed      by a nationally recognized association or independent testing laboratory      as specified below:  (1)  The piping is constructed of fiberglass-reinforced plastic; or       [Note:  The following codes and standards may be used to comply with      paragraph (b)(1) of this section:  (A)  Underwriters Laboratories Subject 971, UL Listed Non-Metal Pipe;  (B)  Underwriters Laboratories Standard 567, Pipe Connectors for      Flammable and Combustible and LP Gas;  (C)  Underwriters Laboratories of Canada Guide ULC-107, Glass Fiber      Reinforced Plastic Pipe and Fittings for Flammable Liquids; and  (D)  Underwriters Laboratories of Canada Standard CAN 4-S633-M81,      Flexible Underground Hose Connectors.]  (2)  The piping is constructed of steel and cathodically protected in the      following manner:  (i)  The piping is coated with a suitable dielectric material;  (ii)  Field-installed cathodic protection systems are designed by a       corrosion expert;  (iii)  Impressed current systems are designed to allow determination of        current operating status as required in 0280.31(c); and  (iv)  Cathodic protection systems are operated and maintained in       accordance with 1280.31 or guidelines established by the implementing       agency; or       [Note:  The following codes and standards may be used to comply with      paragraph (b)(2) of this section:  (A)  National Fire Protection Association Standard 30, Flammable and      Combustible Liquids Code;  (B)  American Petroleum Institute Publication 1615, Installation of      Underground Petroleum Storage Systems;  (C)  American Petroleum Institute Publication 1632, Cathodic Protection      of Underground Petroleum Storage Tanks and Piping Systems; and  (D)  National Association of Corrosion Engineers Standard RP-01-69,      Control of External Corrosion on Submerged Metallic Piping Systems.]  (3)  The piping is constructed of metal without additional corrosion      protection measures provided that:  (i)  The piping is installed at a site that is determined by a corrosion      expert to not be corrosive enough to cause it to have a release due to      corrosion during its operating life; and  (ii)  Owners and operators maintain records that demonstrate compliance       with the requirements of paragraph (b)(3)(i) of this section for the      remaining  life of the piping; or       [Note:  National Fire Protection Association Standard 30, Flammable and      Combustible Liquids Code; and National Association of Corrosion      Engineers Standard RP-01-69, Control of External Corrosion on Submerged      Metallic Piping Systems, may be used to comply with paragraph (b)(3) of      this section.]  (4)  The piping construction and corrosion protection are determined by      the implementing agency to be designed to prevent the release or      threatened release of any stored regulated substance in a manner that is      no less protective of human health and the environment than the      requirements in paragraphs (b)(1) through (3) of this section.  2Explain280.20(c)     =    ╪    ┌(c)    =  Spill and overfill prevention equipment.  (1)  Except as provided in paragraph (c)(2) of this section, to prevent      spilling and overfilling associated with product transfer to the UST      system, owners and operators must use the following spill and overfill      prevention equipment:  (i)  Spill prevention equipment that will prevent release of product to      the environment when the transfer hose is detached from the fill pipe      (for example, a spill catchment basin); and  (ii)  Overfill prevention equipment that will:  (A)  Automatically shut off flow into the tank when the tank is no more      than 95 percent full; or  (B)  Alert the transfer operator when the tank is no more than 90 percent      full by restricting the flow into the tank or triggering a high-level      alarm.  (2)  Owners and operators are not required to use the spill and overfill      prevention equipment specified in paragraph (c)(1) of this section if:  (i) Alternative equipment is used that is determined by the implementing      agency to be no less protective of human health and the environment than      the equipment specified in paragraph (c)(1)(i) or (ii) of this section;      or  (ii)  The UST system is filled by transfers of no more than 25 gallons at       one time.  3Explain280.20(d)     @    ∩(d)    @  Installation.  All tanks and piping must be properly installed in      accordance with a code of practice developed by a nationally recognized      association or independent testing laboratory and in accordance with the      manufacturers instructions.       [Note:  Tank and piping system installation practices and procedures      described in the following codes may be used to comply with the      requirements of paragraph (d) of this section:  (i)  American Petroleum Institute Publication 1615, Installation of      Underground Petroleum Storage System; or  (ii)  Petroleum Equipment Institute Publication RP100, Recommended       Practices for Installation of Underground Liquid Storage Systems; or  (iii)  American National Standards Institute Standard B31.3, Petroleum        Refinery Piping, and American National Standards Institute Standard        B31.4 Liquid Petroleum Transportation Piping System.]  4Explain280.20(e)     >    K(e)    >    K  Certification of installation.  All owners and operators must ensure      that one or more of the following methods of certification, testing, or      inspection is used to demonstrate compliance with paragraph (d) of this      section by providing a certification of compliance on the UST      notification form in accordance with 2280.22.  (1)  The installer has been certified by the tank and piping      manufacturers; or  (2)  The installer has been certified or licensed by the implementing      agency; or  (3)  The installation has been inspected and certified by a registered      professional engineer with education and experience in UST system      installation; or  (4)  The installation has been inspected and approved by the implementing      agency; or  (5)  All work listed in the manufacturers installation checklists has      been completed; or  (6)  The owner and operator have complied with another method for      ensuring compliance with paragraph (d) of this section that is determined      by the implementing agency to be no less protective of human health and      the environment. i         b    g    j    ¥    ─    ╧280.21    b    g    j    ¥  Upgrading of existing UST systems.  5Explain280.21(a) (a)  Alternatives allowed. Not later than December22,1998, all existing UST systems must comply with one of the following requirements:  (1)  New UST system performance standards under  3280.20;  (2)  The upgrading requirements in sections (b) through (d) of this      section; or  (3)  Closure requirements under Subpart G of this Part, including      applicable requirements for corrective action under Subpart F.  6Explain280.21(b)     e(b)    e  Tank upgrading requirements.  Steel tanks must be upgraded to meet      one of the following requirements in accordance with a code of practice      developed by a nationally recognized association or independent testing      laboratory:  (1)  Interior lining.  A tank may be upgraded by internal lining if:  (i)  The lining is installed in accordance with the requirements of      5280.33, and  (ii)  Within 10 years after lining, and every 5 years thereafter, the      lined tank is internally inspected and found to be structurally sound      with the lining still performing in accordance with original design      specifications.  (2)  Cathodic protection.  A tank may be upgraded by cathodic protection      if the cathodic protection system meets the requirements of       6280.20(a)(2)(ii), (iii), and (iv) and the integrity of the tank is      ensured using one of the following methods:  (i)  The tank is internally inspected and assessed to ensure that the      tank is structurally sound and free of corrosion holes prior to      installing the cathodic protection system; or  (ii)  The tank has been installed for less than 10 years and is monitored      monthly for releases in accordance with 7280.43(d) through (h); or  (iii)  The tank has been installed for less than 10 years and is assessed     for corrosion holes by conducting two (2) tightness tests that meet the     requirements of 8280.43(c).  The first tightness test must be conducted     prior to installing the cathodic protection system.  The second tightnesstest must be conducted between three (3) and six (6) months following thefirst operation of the cathodic protection system; or  (iv) The tank is assessed for corrosion holes by a method that is      determined by the implementing agency to prevent releases in a manner      that is  no less protective of human health and the environment than      paragraphs (b)(2)(i) through (iii) of this section.  (3)  Internal lining combined with cathodic protection.  A tank may be     upgraded by both internal lining and cathodic protection if:  (i)  The lining is installed in accordance with the requirements of      9280.33; and  (ii)  The cathodic protection system meets the requirements of       :280.20(a)(2)(ii), (iii), and (iv).       [Note:  The following codes and standards may be used to comply with      this section:  (A)  American Petroleum Institute Publication 1631, Recommended Practice      for the Interior Lining of Existing Steel Underground Storage Tanks;  (B)  National Leak Prevention Association Standard 631, Spill      Prevention, Minimum 10 Year Life Extension of Existing Steel Underground      Tanks by Lining Without the Addition of Cathodic Protection;  (C)  National Association of Corrosion Engineers Standard RP-02-85,      Control of External Corrosion on Metallic Buried, Partially Buried, or      Submerged Liquid Storage Systems; and  (D)  American Petroleum Institute Publication 1632, Cathodic Protection      of Underground Petroleum Storage Tanks and Piping Systems.]  7Explain280.21(c) (c)  Piping upgrading requirements.  Metal piping that routinely contains      regulated substances and is in contact with the ground must be      cathodically protected in accordance with a code of practice developed by      a nationally recognized association or independent testing laboratory and      must meet the requirements of  ;280.20(b)(2)(ii), (iii), and (iv).       [Note:  The codes and standards listed in the note following       <280.20(b)(2) may be used to comply with this requirement.]  8Explain280.21(d)     ┘(d)  Spill and overfill prevention equipment.  To prevent spilling and      overfilling associated with product transfer to the UST system, all      existing UST systems must comply with new UST system spill and overfill      prevention equipment requirements specified in  =280.20(c).          2    J    ╕    ╣    ║    ╗    ▄                                )    ,    -280.22    2    J  Notification requirements.  ≈Explain280.22ingeneral  ;Explain280.22(a) (a)  Any owner who brings an underground storage tank system into use      after May 8, 1986, must within 30 days of bringing such tank into use,      submit, in the form prescribed in Appendix I of this Part, a notice of      existence of such tank system to the state or local agency or department      designated in Appendix II of this Part to receive such notice.       [Note:  Owners and operators of UST systems that were in the ground on or      after May 8, 1986, unless taken out of operation on or before January 1,      1974, were required to notify the designated state or local agency in      accordance with the Hazardous and Solid Waste Amendments of 1984, Public      Law 98-616, on a form published by EPA on November 8, 1985 (50 FR 46602)      unless notice was given pursuant to section 103(c) of CERCLA.  Owners and      operators who have not complied with the notification requirements may      use portions I through VI of the notification form contained in Appendix      I of this Part.]  <Explain280.22(b) (b)  In states where state law, regulations, or procedures require owners      to use forms that differ from those set forth in Appendix I of this Part      to fulfill the requirements of this section, the state forms may be      submitted in lieu of the forms set forth in Appendix I of this Part.  If      a state requires that its form be used in lieu of the form presented in      this regulation, such form must meet the requirements of Section 9002.  >Explain280.22(c) (c)  Owners required to submit notices under paragraph (a) of this      section must provide notices to the appropriate agencies or departments      identified in Appendix II of this Part for each tank they own.  Owners      may provide notice for several tanks using one notification form, but      owners who own tanks located at more than one place of operation must      file a separate notification form for each separate place of operation.  =Explain280.22(d) (d)  Notices required to be submitted under paragraph (a) of this section      must provide all of the information in Sections I through VI of the      prescribed form (or appropriate state form) for each tank for which      notice must be given. Notices for tanks installed after December22, 1988 must also provide all of the information in Section VII of the prescribed form (or appropriate state form) for each tank for which notice must be given.  ?Explain280.22(e)     ▌(e)  All owners and operators of new UST systems must certify in the      notification form compliance with the following requirements:  (1)  Installation of tanks and piping under  >280.20(e);  (2)  Cathodic protection of steel tanks and piping under  ?280.20(a) and      (b);  (3)  Financial responsibility under Subpart H of this Part; and  (4)  Release detection under280.41and280.42.  0Explain280.22(f) (f)  All owners and operators of new UST systems must ensure that the      installer certifies in the notification form that the methods used to      install the tanks and piping complies with the requirements in  @280.20(d).  AExplain280.22(g) (g)  Beginning October24,1988, any person who sells a tank intended to be used as an underground storage tank must notify the purchaser of such tank of the owners notification obligations under paragraph (a) of this section.  The form provided in Appendix III of this part may be used to comply with this requirement.  e        ╔    Φ280.30  Spill and overfill control.  BExplain280.30(a) (a)  Owners and operators must ensure that releases due to spilling or      overfilling do not occur.  The owner and operator must ensure that the      volume available in the tank is greater than the volume of product to be      transferred to the tank before the transfer is made and that the transfer      operation is monitored constantly to prevent overfilling and spilling.       [Note:  The transfer procedures described in National Fire Protection      Association Publication 385 may be used to comply with paragraph (a) of      this section.  Further guidance on spill and overfill prevention appears      in American Petroleum Institute Publication 1621, Recommended Practice      for Bulk Liquid Stock Control at Retail Outlets, and National Fire      Protection Association Standard 30, Flammable and Combustible Liquids      Code.]  CExplain280.30(b) (b)  The owner and operator must report, investigate, and clean up any      spills and overfills in accordance with C280.53. e        /    4    U    ¢280.31    /    4    U    ¢  Operation and maintenance of corrosion protection.       All owners and operators of steel UST systems with corrosion protection      must comply with the following requirements to ensure that releases due      to corrosion are prevented for as long as the UST system is used to store      regulated substances:  DExplain280.31(a) (a)  All corrosion protection systems must be operated and maintained to      continuously provide corrosion protection to the metal components of that      portion of the tank and piping that routinely contain regulated      substances and are in contact with the ground.  EExplain280.31(b)     H(b)    H  All UST systems equipped with cathodic protection systems must be      inspected for proper operation by a qualified cathodic protection tester      in accordance with the following requirements:  (1)  Frequency.  All cathodic protection systems must be tested within 6      months of installation and at least every 3 years thereafter or according      to another reasonable time frame established by the implementing agency;      and  (2) Inspection criteria.  The criteria that are used to determine that      cathodic protection is adequate as required by this section must be in      accordance with a code of practice developed by a nationally recognized      association.       [Note:  National Association of Corrosion Engineers Standard RP-02-85,      Control of External Corrosion on Metallic Buried, Partially Buried, or      Submerged Liquid Storage Systems, may be used to comply with paragraph      (b)(2) of this section.]  FExplain280.31(c)     .    0    1(c)    .    0    1  UST systems with impressed current cathodic protection systems must      also be inspected every 60 days to ensure the equipment is running      properly.  GExplain280.31((d) (d)  For UST systems using cathodic protection, records of the operation      of the cathodic protection must be maintained (in accordance withD280.34)to demonstrate compliance with the performance standards in thissection. These records must provide the following:  (1)  The results of the last three inspections required in paragraph (c)      of this section; and  (2)  The results of testing from the last two inspections required in      paragraph (b) of this section.  d        ±280.32  Compatibility.  ÉExplain280.32      Owners and operators must use an UST system made of or lined with      materials that are compatible with the substance stored in the UST      system.       [Note:  Owners and operators storing alcohol blends may use the following      codes to comply with the requirements of this section:  (A)  American Petroleum Institute Publication 1626, Storing and Handling      Ethanol and Gasoline-Ethanol Blends at Distribution Terminals and Service      Stations; and  (B)  American Petroleum Institute Publication 1627, Storage and Handling      of Gasoline-Methanol/Cosolvent Blends at Distribution Terminals and      Service Stations.] g        5    9    ≥280.33    5    9  Repairs allowed.     Owners and operators of UST systems must ensure that repairs will prevent      releases due to structural failure or corrosion as long as the UST system is used to store regulated substances.  The repairsmust meet the following requirements:  HExplain280.33(a) (a)  Repairs to UST systems must be properly conducted in accordance with      a code of practice developed by a nationally recognized association or an      independent testing laboratory.       [Note:  The following codes and standards may be used to comply with      paragraph (a) of this section:  National Fire Protection Association      Standard 30, Flammable and Combustible Liquids Code;  American      Petroleum Institute Publication 2200, Repairing Crude Oil, Liquified      Petroleum Gas, and Product Pipelines;  American Petroleum Institute      Publication 1631, Recommended Practice for the Interior Lining of      Existing Steel Underground Storage Tanks; and National Leak Prevention      Association Standard 631, Spill Prevention, Minimum 10 Year Life      Extension of Existing Steel Underground Tanks by Lining Without the      Addition of Cathodic Protection.]  IExplain280.33(b) (b)  Repairs to fiberglass-reinforced plastic tanks may be made by the      manufacturers authorized representatives or in accordance with a code of      practice developed by a nationally recognized association or an      independent testing laboratory.  JExplain280.33(c) (c)  Metal pipe sections and fittings that have released product as a      result of corrosion or other damage must be replaced.  Fiberglass pipes      and fittings may be repaired in accordance with the manufacturers      specifications.  KExplain280.33(d) (d)  Repaired tanks and piping must be tightness tested in accordance      with E280.43(c) anda÷280.44(b)within 30 days following the date of the      completion of the repair except as provided in paragraphs (d)(1) through      (3), of this section:  (1)  The repaired tank is internally inspected in accordance with a code      of practice developed by a nationally recognized association or an      independent testing laboratory; or  (2)  The repaired portion of the UST system is monitored monthly for      releases in accordance with a method specified in G280.43(d) through (h);or  (3)  Another test method is used that is determined by the implementing      agency to be no less protective of human health and the environment than      those listed above.  LExplain280.33(e) (e)  Within 6 months following the repair of any cathodically protected      UST system, the cathodic protection system must be tested in accordance      with H280.31(b) and (c) to ensure that it is operating prop-erly.  MExplain280.33(f)     V(f)    V  UST system owners and operators must maintain records of each repair      for the remaining operating life of the UST system that demonstrate      compliance with the requirements of this section. p        D    |    Ñ280.34    D    |    Ñ  Reporting and recordkeeping.       Owners and operators of UST systems must cooperate fully with      inspections, monitoring and testing conducted by the implementing agency,      as well as requests for document submission, testing, and monitoring by      the owner or operator pursuant to section 9005 of Subtitle I of the      Resource Conservation and Recovery Act, as amended.  NExplain280.34(a) (a)  Reporting.  Owners and operators must submit the following      information to the implementing agency:  (1)  Notification for all UST systems (J280.22), which includes      certification of installation for new UST systems ( K280.20(e));  (2)  Reports of all releases including suspected releases (L280.50),      spills and overfills (M280.53), and confirmed releases (N280.61);  (3)  Corrective actions planned or taken including initial abatement      measures ( P280.62), initial site characterization (!O280.63), free  product removal b(280.64), investigation of soil and ground-water cleanup(#R280.65), and corrective action plan ($S280.66); and  (4)  A notification before permanent closure or change-in-service      ('T280.71).  PExplain280.34(b) (b)  Recordkeeping.  Owners and operators must maintain the following      information:  (1)  A corrosion experts analysis of site corrosion potential if      corrosion protection equipment is not used ( I280.20(a)(4); 280.20(b)(3)).  (2)  Documentation of operation of corrosion protection equipment      (U280.31);  (3)  Documentation of UST system repairs (V280.33(f));  (4)  Recent compliance with release detection requirements (W280.45);      and  (5)  Results of the site investigation conducted at permanent closure      (*X280.74).  OExplain280.34(c) (c)  Availability and Maintenance of Records.  Owners and operators must      keep the records required either:  (1)  At the UST site and immediately available for inspection by the      implementing agency; or  (2)  At a readily available alternative site and be provided for      inspection to the implementing agency upon request.  (3)  In the case of permanent closure records required under *Y280.74,      owners and operators are also provided with the additional alternative of      mailing closure records to the implementing agency if they cannot be kept      at the site or an alternative site as indicated above.       (Note:  The recordkeeping and reporting requirements listed in this      section have been approved by the Office of Management and Budget and      have been assigned OMB Control No. 2050-0068.)  n        ▓    ╛    ╓280.40  General requirements for all UST systems.  [LeakDetectionAdvisor  QExplain280.40(a)     █(a)  Owners and operators of new and existing UST systems must provide a      method, or combination of methods, of release detection that:      ╫(1)  Can detect a release from any portion of the tank and the connected      underground piping that routinely contains product;  (2)  Is installed, calibrated, operated, and maintained in accordance      with the manufacturers instructions, including routine maintenance and service checks for operability or running condition; and  (3)  Meets the performance requirements in Z280.43 ora≈280.44, with any      performance claims and their manner of determination described in writing      by the equipment manufacturer or installer.  In addition, methods used      after December22,1990 except for methods permanently installed prior to ìthat date, must be capable of detecting the leak rate or quantity specified forthatmethodin\280.43(b),(c),and(d)ora°280.44(a)and (b) withaprobabilityofdetectionof0.95andaprobabilityofìfalsealarm of0.05.  RExplain280.40(b) (b)  When a release detection method operated in accordance with the      performance standards in ^280.43 anda∙280.44indicates a release may have occurred, owners and operators must notify the implementing agency inaccordance with Subpart E.  zLeakDetectionAdvisor SExplain280.40(c) (c)  Owners and operators of all UST systems must comply with the release      detection requirements of this Subpart by December22,1988 of the year listed in the following table:  SCHEDULEFORPHASE-INOFRELEASEDETECTION  YearYearwhenreleasedetectioninrequired system(byDecember22oftheyearindicated) wasintalled                 19891990199119921993  BeforeRDP1965 or date unknown. 1965-69..P/RD 1970-74..                            PRD 1975-79..    PRD 1980-88..                            P                  RD  Newtanks(afterDecember22)immediatelyuponinstallation.  P=Mustbeginreleasedetectionfortanksandsuctionpipinginaccordance ìwith280.41(b)(1)and280.42(b)(4). RD=Mustbeginreleasedetectionfortanksandsuctionpipinginaccordance ìwith280.41(a),280.41(b)(2),and280.42.  TExplain280.40(d) (d)  Any existing UST system that cannot apply a method of release      detection that complies with the requirements of this Subpart must      complete the closure procedures in Subpart G by the date on which release      detection is required for that UST system under paragraph (c) of this      section. c        A    s    v    y        ┐    ┴    ┬    ╩    ╠    ═    ╥    280.41    A    s    v    y      Requirements for petroleum UST systems.  \LeakDetectionAdvisor       Owners and operators of petroleum UST systems must provide release      detection for tanks and piping as follows:  UExplain280.41(a) (a)  Tanks.  Tanks must be monitored at least every 30 days for releases      using one of the methods listed in `280.43(d)-(h) except that:  (1)  UST systems that meet the performance standards in  a280.20 or      b280.21, and the monthly inventory control requirements in c280.43(a) or (b), may use tank tightness testing (conducted in accordance with      d280.43(c)) at least every 5 years until December22,1998, or until 10years afterthe tank is installed or upgraded under e280.21(b), whichever is later;  (2)  UST systems that do not meet the performance standards in  f280.20      or g280.21 may use monthly inventory controls (conducted in accordance      with h280.43(a) or (b)) and annual tank tightness testing (conducted in      accordance with i280.43(c)) until December22,1998 when the tank must be upgradedunder j280.21 or permanently closed under 'k280.71; and  (3)  Tanks with capacity of 550 gallons or less may use weekly tank      gauging (conducted in accordance with l280.43(b)).  VExplain280.41(b) (b)  Piping.  Underground piping that routinely contains regulated      substances must be monitored for releases in a manner that meets one of      the following requirements:  (1)  Pressurized piping.  Underground piping that conveys regulated      substances under pressure must:  (i)  Be equipped with an automatic line leak detector conducted in      accordance witha·280.44(a); and  (ii)  Have an annual line tightness test conducted in accordance with      a√280.44(b)or have monthly monitoring conducted in accordance with      aⁿ280.44(c).  (2)  Suction piping.  Underground piping that conveys regulated substances      under suction must either have a line tightness test conducted at least      every 3 years and in accordance witha²280.44(b), or use a monthly      monitoring method conduct in accordance witha■280.44(c).  No release      detection is required for suction piping that is designed and constructed      to meet the following standards:  (i)  The below-grade piping operates at less than atmospheric pressure;  (ii)  The below-grade piping is sloped so that the contents of the pipe       will drain back into the storage tank if the suction is released;  (iii)  Only one check valve is included in each suction line;  (iv)  The check valve is located directly below and as close as practical       to the suction pump; and  (v)  A method is provided that allows compliance with paragraphs      (b)(2)(ii)-(iv) of this section to be readily determined. e        B    Ç    ╦    ╙280.42    B    Ç  Requirements for hazardous substance UST systems.  ]LeakDetectionAdvisor       Owners and operators of hazardous substance UST systems must provide      release detection that meets the following requirements:  WExplain280.42(a) (a)  Release detection at existing UST systems must meet the requirements      for petroleum UST systems in s280.41.  By December22,1998, all existinghazardous substance UST systems must meet the release detection requirements for new systems in paragraph (b) of this section.  XExplain280.42(b) (b)  Release detection at new hazardous substance UST systems must meet      the following requirements:  (1)  Secondary containment systems must be designed, constructed and      installed to:  (i)  Contain regulated substances released from the tank system until      they are detected and removed;  (ii)  Prevent the release of regulated substances to the environment at       any time during the operational life of the UST system; and  (iii)  Be checked for evidence of a release at least every 30 days.       [Note:  The provisions of 40 CFR 265.193, Containment and Detection of      Releases, may be used to comply with these requirements.]  (2)  Double-walled tanks must be designed, constructed, and installed to:  (i)  Contain a release from any portion of the inner tank within the      outer wall; and  (ii)  Detect the failure of the inner wall.  (3)  External liners (including vaults) must be designed, constructed,      and installed to:  (i)  Contain 100 percent of the capacity of the largest tank within its      boundary;  (ii)  Prevent the interference of precipitation or ground-water intrusion      with the ability to contain or detect a release of regulated substances;      and  (iii)  Surround the tank completely (i.e., it is capable of preventing        lateral as well as vertical migration of regulated substances).  (4)  Underground piping must be equipped with secondary containment that      satisfies the requirements of paragraph (b)(1) of this section (e.g.,      trench liners, jacketing of double-walled pipe).  In addition,      underground piping that conveys regulated substances under pressure must      be equipped with an automatic line leak detector in accordance with      280.44(a).  (5)  Other methods of release detection may be used if owners and      operators:  (i)  Demonstrate to the implementing agency that an alternate method can      detect a release of the stored substance as effectively as any of the      methods allowed in u280.43(b)-(h)candetectareleaseofpetroleum;  ì (ii)  Provide information to the implementing agency on effective       corrective action technologies, health risks, and chemical and physical       properties of the stored substance, and the characteristics of the UST       site; and,  (iii)  Obtain approval from the implementing agency to use the alternate        release detection method before the installation and operation of the      new UST system.  a        Z    ^    {    ñ    ╤    ╘280.43    Z    ^    {    ñ  Methods of release detection for tanks.  ^LeakDetectionAdvisor  @Explain280.43      Each method of release detection for tanks used to meet the requirements      of v280.41 must be conducted in accordance with the following:      c    h    w    x(a)    c    h    w    x  Inventory control.  Product inventory control (or another test of      equivalent performance) must be conducted monthly to detect a release of      at least 1.0 percent of flow-through plus 130 gallons on a monthly basis      in the following manner:  (1)  Inventory volume measurements for regulated substance inputs,      withdrawals, and the amount still remaining in the tank are recorded each      operating day;  (2)  The equipment used is capable of measuring the level of product over      the full range of the tanks height to the nearest one-eighth of an inch;  (3)  The regulated substance inputs are reconciled with delivery receipts      by measurement of the tank inventory volume before and after delivery;  (4)  Deliveries are made through a drop tube that extends to within one      foot of the tank bottom;  (5)  Product dispensing is metered and recorded within the local      standards for meter calibration or an accuracy of 6 cubic inches for      every 5 gallons of product withdrawn; and  (6)  The measurement of any water level in the bottom of the tank is made      to the nearest one-eighth of an inch at least once a month.       [Note:  Practices described in the American Petroleum Institute      Publication 1621, Recommended Practice for Bulk Liquid Stock Control at      Retail Outlets, may be used, where applicable, as guidance in meeting      the requirements of this paragraph.]      \    l    u(b)    \    l    u  Manual tank gauging.  Manual tank gauging must meet the following      requirements:  (1)  Tank liquid level measurements are taken at the beginning and ending      of a period of at least 36 hours during which no liquid is added to or      removed from the tank;  (2)  Level measurements are based on an average of two consecutive stick      readings at both the beginning and ending of the period;  (3)  The equipment used is capable of measuring the level of product over      the full range of the tanks height to the nearest one-eighth of an inch;  (4)  A leak is suspected and subject to the requirements of Subpart E if      the variation between beginning and ending measurements exceeds the      weekly or monthly standards in the following table:   Nominal               Weekly Standard    Monthly Standard      Tank Capacity              (one test)    (average of four tests)       550 gallons or less         10 gallons           5 gallons      551-1,000 gallons           13 gallons           7 gallons      1,001-2,000 gallons         26 gallons          13 gallons  (5)  Only tanks of 550 gallons or less nominal capacity may use this as      the sole method of release detection.  Tanks of 551 to 2,000 gallons may      use the method in place of manual inventory control in w280.43(a). Tanks      of greater than 2,000 gallons nominal capacity may not use this method to      meet the requirements of this subpart.      8    E    d    i    }    â(c)    8    E    d    i    }    â  Tank tightness testing.  Tank tightness testing (or another test of      equivalent performance) must be capable of detecting a 0.1 gallon per      hour leak rate from any portion of the tank that routinely contains      product while accounting for the effects of thermal expansion or      contraction of the product, vapor pockets, tank deformation, evaporation      or condensation, and the location of the water table.      7    G    `(d)    7    G    `  Automatic tank gauging.  Equipment for automatic tank gauging that      tests for the loss of product and conducts inventory control must meet      the following requirements:  (1)  The automatic product level monitor test can detect a 0.2 gallon per      hour leak rate from any portion of the tank that routinely contains      product; and  (2) Inventory control (or another test of equivalent performance) is      conducted in accordance with the requirements of x280.43(a).      z    ú    (e)    z    ú  Vapor monitoring.  Testing or monitoring for vapors within the soil      gas of the excavation zone must meet the following requirements:  (1)  The materials used as backfill are sufficiently porous (e.g.,      gravel, sand, crushed rock) to readily allow diffusion of vapors from      releases into the excavation area;  (2)  The stored regulated substance, or a tracer compound placed in the      tank system, is sufficiently volatile (e.g., gasoline) to result in a      vapor level that is detectable by the monitoring devices located in the      excavation zone in the event of a release from the tank;  (3)  The measurement of vapors by the monitoring device is not rendered      inoperative by the ground water, rainfall, or soil moisture or other      known interferences so that a release could go undetected for more than      30 days;  (4)  The level of background contamination in the excavation zone will      not interfere with the method used to detect releases from the tank;  (5)  The vapor monitors are designed and operated to detect any      significant increase in concentration above background of the regulated      substance stored in the tank system, a component or components of that      substance, or a tracer compound placed in the tank system;  (6)  In the UST excavation zone, the site is assessed to ensure      compliance with the requirements in paragraphs (e)(1)-(4) of this section      and to establish the number and positioning of monitoring wells that will      detect releases within the excavation zone from any portion of the tank      that routinely contains product; and  (7)  Monitoring wells are clearly marked and secured to avoid      unauthorized access and tampering.  (f)  Ground-water monitoring.  Testing or monitoring for liquids on the      ground water must meet the following requirements:  (1)  The regulated substance stored is immiscible in water and has a      specific gravity of less than one;  (2)  Ground water is never more than 20 feet from the ground surface and      the hydraulic conductivity of the soil(s) between the UST system and the      monitoring wells or devices is not less than 0.01 cm/sec (e.g., the soil      should consist of gravels, coarse to medium sands, coarse silts or other      permeable materials);  (3)  The slotted portion of the monitoring well casing must be designed      to prevent migration of natural soils or filter pack into the well and to      allow entry of regulated substance on the water table into the well under      both high and low ground-water conditions;  (4)  Monitoring wells shall be sealed from the ground surface to the top      of the filter pack;  (5)  Monitoring wells or devices intercept the excavation zone or are as      close to it as is technically feasible;  (6)  The continuous monitoring devices or manual methods used can detect      the presence of at least one-eighth of an inch of free product on top of      the ground water in the monitoring wells;  (7)  Within and immediately below the UST system excavation zone, the      site is assessed to ensure compliance with the requirements in paragraphs      (f)(1)-(5) of this section and to establish the number and positioning of      monitoring wells or devices that will detect releases from any portion of      the tank that routinely contains product; and  (8)  Monitoring wells are clearly marked and secured to avoid      unauthorized access and tampering.  (g)  Interstitial monitoring.  Interstitial monitoring between the UST      system and a secondary barrier immediately around or beneath it may be      used, but only if the system is designed, constructed and installed to      detect a leak from any portion of the tank that routinely contains      product and also meets one of the following requirements:  (1)  For double-walled UST systems, the sampling or testing method can      detect a release through the inner wall in any portion of the tank that      routinely contains product;       [Note:  The provisions outlined in the Steel Tank Institutes Standard      for Dual Wall Underground Storage Tanks may be used as guidance for      aspects of the design and construction of underground steel double-walled      tanks.]  (2)  For UST systems with a secondary barrier within the excavation zone,      the sampling or testing method used can detect a release between the UST      system and the secondary barrier;  (i)  The secondary barrier around or beneath the UST system consists of      artificially constructed material that is sufficiently thick and      impermeable (at least 10-6 cm/sec for the regulated substance stored) to      direct a release to the monitoring point and permit its detection;  (ii)  The barrier is compatible with the regulated substance stored so       that a release from the UST system will not cause a deterioration of the      barrier allowing a release to pass through undetected;  (iii)  For cathodically protected tanks, the secondary barrier must be       installed so that it does not interfere with the proper operation of the       cathodic protection system;  (iv)  The ground water, soil moisture, or rainfall will not render the       testing or sampling method used inoperative so that a release could go       undetected for more than 30 days;  (v)  The site is assessed to ensure that the secondary barrier is always      above the ground water and not in a 25-year flood plain, unless the      barrier and monitoring designs are for use under such conditions; and,  (vi)  Monitoring wells are clearly marked and secured to avoid       unauthorized access and tampering.  (3)  For tanks with an internally fitted liner, an automated device can      detect a release between the inner wall of the tank and the liner, and      the liner is compatible with the substance stored.  (h)  Other methods.  Any other type of release detection method, or      combination of methods, can be used if:  (1)  It can detect a 0.2 gallon per hour leak rate or a release of 150      gallons within a month with a probability of detection of 0.95 and a      probability of false alarm of 0.05; or  (2)  The implementing agency may approve another method if the owner and      operator can demonstrate that the method can detect a release as      effectively as any of the methods allowed in paragraphs (c)-(h) of this      section.  In comparing methods, the implementing agency shall consider      the size of release that the method can detect and the frequency and      reliability with which it can be detected.  If the method is approved,      the owner and operator must comply with any conditions imposed by the      implementing agency on its use to ensure the protection of human health      and the environment. nThisissampletext. a        W280.45    W  Release detection recordkeeping.  YExplain280.45ingeneral       All UST system owners and operators must maintain records in accordance      with |280.34 demonstrating compliance with all applicable requirements of this Subpart.  These records must include the following:  dExplain280.45(a) (a)  All written performance claims pertaining to any release detection      system used, and the manner in which these claims have been justified or      tested by the equipment manufacturer or installer, must be maintained for      5 years, or for another reasonable period of time determined by the      implementing agency, from the date of installation;  eExplain28.45(b) (b)  The results of any sampling, testing, or monitoring must be      maintained for at least 1 year, or for another reasonable period of time      determined by the implementing agency, except that the results of tank      tightness testing conducted in accordance with }280.43(c) must be retained until the next test is conducted; and  fExplain280.45(c) (c)  Written documentation of all calibration, maintenance, and repair of      release detection equipment permanently located on-site must be      maintained for at least one year after the servicing work is completed,      or for another reasonable time period determined by the implementing      agency.  Any schedules of required calibration and maintenance provided      by the release detection equipment manufacturer must be retained for 5      years from the date of installation. i        L    é280.50    L    é  Reporting of suspected releases.       Owners and operators of UST systems must report to the implementing      agency within 24 hours, or another reasonable time period specified by      the implementing agency, and follow the procedures in ~280.52 for any of      the following conditions:  gExplain280.50(a) (a)  The discovery by owners and operators or others of released      regulated substances at the UST site or in the surrounding area (such as      the presence of free product or vapors in soils, basements, sewer and      utility lines, and nearby surface water).  hExplain280.50(b) (b)  Unusual operating conditions observed by owners and operators (such      as the erratic behavior of product dispensing equipment, the sudden loss      of product from the UST system, or an unexplained presence of water in      the tank), unless system equipment is found to be defective but not      leaking, and is immediately repaired or replaced; and,  iExplain280.50(c) (c)  Monitoring results from a release detection method required under      280.41 and Ç280.42 that indicate a release may have occurred unless:  (1)  The monitoring device is found to be defective, and is immediately      repaired, recalibrated or replaced, and additional monitoring does not      confirm the initial result; or  (2)  In the case of inventory control, a second month of data does not      confirm the initial result.  x    280.51 Investigation due to off-site impacts.  jExplain280.51      When required by the implementing agency, owners and operators of UST      systems must follow the procedures in ü280.52 to determine if the UST      system is the source of off-site impacts.  These impacts include the      discovery of regulated substances (such as the presence of free product      or vapors in soils, basements, sewer and utility lines, and nearby      surface and drinking waters) that has been observed by the implementing      agency or brought to its attention by another party.          ~    ü    å280.52    ~    ü    å  Release investigation and confirmation steps.       Unless corrective action is initiated in accordance with Subpart F,      owners and operators must immediately investigate and confirm all      suspected releases of regulated substances requiring reporting under      é280.50 within 7 days, or another reasonable time period specified by  the implementing agency, using either the following steps or another      procedure approved by the implementing agency:  kExplain280.52(a) (a)  System test.  Owners and operators must conduct tests (according to      the requirements for tightness testing in â280.43(c) anda 280.44(b))  that determine whether a leak exists in that portion of the tank that      routinely contains product, or the attached delivery piping, or both.  (1)  Owners and operators must repair, replace or upgrade the UST system,      and begin corrective action in accordance with Subpart F if the test      results for the system, tank, or delivery piping indicate that a leak      exists.  (2)  Further investigation is not required if the test results for the      system, tank, and delivery piping do not indicate that a leak exists and      if environmental contamination is not the basis for suspecting a release.  (3)  Owners and operators must conduct a site check as described in      paragraph (b) of this section if the test results for the system, tank,      and delivery piping do not indicate that a leak exists but environmental      contamination is the basis for suspecting a release.      çlExplain280.52(b) (b)    ç  Site check.  Owners and operators must measure for the presence of a      release where contamination is most likely to be present at the UST site.      In selecting sample types, sample locations, and measurement methods,      owners and operators must consider the nature of the stored substance,      the type of initial alarm or cause for suspicion, the type of backfill,      the depth of ground water, and other factors appropriate for identifying      the presence and source of the release.  (1)  If the test results for the excavation zone or the UST site indicate      that a release has occurred, owners and operators must begin corrective      action in accordance with Subpart F;  (2)  If the test results for the excavation zone or the UST site do not      indicate that a release has occurred, further investigation is not      required. d        C    M        *    .280.53    C    M  Reporting and cleanup of spills and overfills.  mExplain280.53(a) (a) Owners and operators of UST systems must contain and immediately      clean up a spill or overfill and report to the implementing agency within      24 hours, or another reasonable time period specified by the implementing      agency, and begin corrective action in accordance with Subpart F in the      following cases:  (1)  Spill or overfill of petroleum that results in a release to the      environment that exceeds 25 gallons or another reasonable amount      specified by the implementing agency, or that causes a sheen on nearby      surface water; and  (2)  Spill or overfill of a hazardous substance that results in a release      to the environment that equals or exceeds its reportable quantity under      CERCLA (40 CFR 302).  nExplain280.53(b) (b)  Owners and operators of UST systems must contain and immediately      clean up a spill or overfill of petroleum that is less than 25 gallons or      another reasonable amount specified by the implementing agency, and a      spill or overfill of a hazardous substance that is less than the      reportable quantity. If cleanup cannot be accomplished within 24 hours,      or another reasonable time period established by the implementing agency,      owners and operators must immediately notify the implementing agency.       [Note:  A release of a hazardous substance equal to or in excess of its      reportable quantity must also be reported immediately (rather than within      24 hours) to the National Response Center under sections 102 and 103 of      the Comprehensive Environmental Response, Compensation, and Liability Act      of 1980 (40 CFR 302.6) and to appropriate state and local authorities      under Title III of the Superfund Amendments and Reauthorization Act of      1986 (40 CFR 355.40).]   l        è    ò280.60    è    ò  General.  ╚Explain280.60      Owners and operators of petroleum or hazardous substance UST systems      must, in response to a confirmed release from the UST system, comply with      the requirements of this subpart except for USTs excluded under     à280.10(b) and UST systems subject to RCRA Subtitle C corrective action requirementsunder section 3004(u) of the Resource Conservation and Recovery Act, as amended. l        N    ï    É    ù    Ö            +    /280.61    N    ï    É    ù    Ö  Initial response.       Upon confirmation of a release in accordance with å280.52 or after a      release from the UST system is identified in any other manner, owners and      operators must perform the following initial response actions within 24      hours of a release or within another reasonable period of time determined      by the implementing agency:  oExplain280.61 (a)  Report the release to the implementing agency (e.g., by telephone or      electronic mail);  (b)  Take immediate action to prevent any further release of the      regulated substance into the environment; and  (c)  Identify and mitigate fire, explosion, and vapor hazards.          P280.62    P  Initial abatement measures and site check.  pExplain280.62(a)     î    ì    Å(a)    î    ì    Å  Unless directed to do otherwise by the implementing agency, owners      and operators must perform the following abatement measures:  (1)  Remove as much of the regulated substance from the UST system as is      necessary to prevent further release to the environment;  (2)  Visually inspect any aboveground releases or exposed belowground      releases and prevent further migration of the released substance into      surrounding soils and ground water;  (3)  Continue to monitor and mitigate any additional fire and safety      hazards posed by vapors or free product that have migrated from the UST      excavation zone and entered into subsurface structures (such as sewers or      basements);  (4)  Remedy hazards posed by contaminated soils that are excavated or      exposed as a result of release confirmation, site investigation,      abatement, or corrective action activities.  If these remedies include      treatment or disposal of soils, the owner and operator must comply with      applicable state and local requirements;  (5)  Measure for the presence of a release where contamination is most      likely to be present at the UST site, unless the presence and source of      the release have been confirmed in accordance with the site check      required by ç280.52(b) or the closure site assessment of (ê280.72(a). In selecting sample types, sample locations, and measurement methods, the      owner and operator must consider the nature of the stored substance, the      type of backfill, depth to ground water and other factors as appropriate      for identifying the presence and source of the release; and      (6)  Investigate to determine the possible presence of free product, and      begin free product removal as soon as practicable and in accordance with     b280.64.  qExplain280.62(b) (b)  Within 20 days after release confirmation, or within another      reasonable period of time determined by the implementing agency, owners      and operators must submit a report to the implementing agency summarizing      the initial abatement steps taken under paragraph (a) of this section and      any resulting information or data. e         O    æ    ÿ    Ü        280.63    O    æ    ÿ    Ü  Initial site characterization.  rExplain280.63(a) (a)  Unless directed to do otherwise by the implementing agency, owners      and operators must assemble information about the site and the nature of      the release, including information gained while confirming the release or      completing the initial abatement measures in è280.60 and ï280.61.  This      information must include, but is not necessarily limited to the      following:  (1)  Data on the nature and estimated quantity of release;  (2)  Data from available sources and/or site investigations concerning      the following factors:  surrounding populations, water quality, use and      approximate locations of wells potentially affected by the release,      subsurface soil conditions, locations of subsurface sewers,      climatological conditions, and land use;  (3)  Results of the site check required under  î280.62(a)(5); and  (4)  Results of the free product investigations required under       ì280.62(a)(6), to be used by owners and operators to determine whether      free product must be recovered under b280.64.  (b)  Within 45 days of release confirmation or another reasonable period      of time determined by the implementing agency, owners and operators must      submit the information collected in compliance with paragraph (a) of this      section to the implementing agency in a manner that demonstrates its      applicability and technical adequacy, or in a format and according to the      schedule required by the implementing agency.        "    R    Æ    
  38. 280.65    R    Æ  Investigations for soil and ground-water cleanup.  yExplain280.65(a) (a)  In order to determine the full extent and location of soils      contaminated by the release and the presence and concentrations of      dissolved product contamination in the ground water, owners and operators      must conduct investigations of the release, the release site, and the      surrounding area possibly affected by the release if any of the following      conditions exist:  (1)  There is evidence that ground-water wells have been affected by the      release (e.g., as found during release confirmation or previous      corrective action measures);  (2)  Free product is found to need recovery in compliance with b280.64;  (3)  There is evidence that contaminated soils may be in contact with      ground water (e.g., as found during conduct of the initial response      measures or investigations required under ò280.60 through b280.64); and  (4)  The implementing agency requests an investigation, based on the      potential effects of contaminated soil or ground water on nearby surface      water and ground-water resources.  sExplain280.65(b) (b)  Owners and operators must submit the information collected under      paragraph (a) of this section as soon as practicable or in accordance      with a schedule established by the implementing agency.  n    #    S    ô     280.66    S    ô  Corrective action plan.  {Explain280.66(a) (a)  At any point after reviewing the information submitted in compliance      with ù280.61 through !ÿ280.63, the implementing agency may require  owners and operators to submit additional information or to develop and ìsubmit acorrectiveactionplanforrespondingtocontaminatedsoilsandìgroundwater.Ifaplanisrequired,ownersandoperatorsmustsubmitìtheplanaccordingtoascheduleandformatestablishedbythe implementing agency.       Alternatively, owners and operators may, after fulfilling the      requirements of Ö280.61 through !Ü280.63, choose to submit a corrective      action plan for responding to contaminated soil and ground water.  In      either case, owners and operators are responsible for submitting a plan      that provides for adequate protection of human health and the environment      as determined by the implementing agency, and must modify their plan as      necessary to meet this standard.  |Explain280.66(b) (b)  The implementing agency will approve the corrective action plan only      after ensuring that implementation of the plan will adequately protect      human health, safety, and the environment.  In making this determination,      the implementing agency should consider the following factors as      appropriate:  (1)  The physical and chemical characteristics of the regulated      substance, including its toxicity, persistence, and potential for      migration;  (2)  The hydrogeologic characteristics of the facility and the      surrounding area;  (3)  The proximity, quality, and current and future uses of nearby      surface water and ground water;  (4)  The potential effects of residual contamination on nearby surface      water and ground water;  (5)  An exposure assessment; and  (6)  Any information assembled in compliance with this subpart.  ╩Explain280.66(c) (c)  Upon approval of the corrective action plan or as directed by the      implementing agency, owners and operators must implement the plan,      including modifications to the plan made by the implementing agency.      They must monitor, evaluate, and report the results of implementing the      plan in accordance with a schedule and in a format established by the      implementing agency.  }Explain280.66(d) (d)  Owners and operators may, in the interest of minimizing      environmental contamination and promoting more effective cleanup, begin      cleanup of soil and ground water before the corrective action plan is      approved provided that they:  (1)  Notify the implementing agency of their intention to begin cleanup;  (2)  Comply with any conditions imposed by the implementing agency,      including halting cleanup or mitigating adverse consequences from cleanup      activities; and  (3)  Incorporate these self-initiated cleanup measures in the corrective      action plan that is submitted to the implementing agency for approval. a    $280.67  Public participation.  ~Explain280.67(a) (a)  For each confirmed release that requires a corrective action plan,      the implementing agency must provide notice to the public by means      designed to reach those members of the public directly affected by the      release and the planned corrective action.  This notice may include, but      is not limited to, public notice in local newspapers, block      advertisements, public service announcements, publication in a state      register, letters to individual households, or personal contacts by field      staff.  Explain280.67(b) (b)  The implementing agency must ensure that site release information      and decisions concerning the corrective action plan are made available to      the public for inspection upon request.  ÇExplain280.67(c) (c) Before approving a corrective action plan, the implementing agency      may hold a public meeting to consider comments on the proposed corrective      action plan if there is sufficient public interest, or for any other      reason.  ╦Explain280.67(d) (d)  The implementing agency must give public notice that complies with      paragraph (a) of this section if implementation of an approved corrective      action plan does not achieve the established cleanup levels in the plan      and termination of that plan is under consideration by the implementing      agency. e    %    ├    ╬    α    σ280.70  Temporary closure.  üExplain280.70(a) (a)  When an UST system is temporarily closed, owners and operators must      continue operation and maintenance of corrosion protection in accordance      with ¢280.31, and any release detection in accordance with Subpart D.      Subparts E and F must be complied with if a release is suspected or      confirmed.  However, release detection is not required as long as the UST      system is empty.  The UST system is empty when all materials have been      removed using commonly employed practices so that no more than 2.5      centimeters (one inch) of residue, or 0.3 percent by weight of the total      capacity of the UST system, remain in the system.  éExplain280.70(b) (b)  When an UST system is temporarily closed for 3 months or more,      owners and operators must also comply with the following requirements:  (1)  Leave vent lines open and functioning; and  (2)  Cap and secure all other lines, pumps, manways, and ancillary      equipment.  âExplain280.70(c) (c)  When an UST system is temporarily closed for more than 12 months,      owners and operators must permanently close the UST system if it does not      meet either performance standards in  £280.20 for new UST systems or the      upgrading requirements in ¥280.21, except that the spill and overfill      equipment requirements do not have to be met.  Owners and operators must      permanently close the substandard UST systems at the end of this 12-month      period in accordance with ₧280.71-280.74,unlesstheimplementingagency  ƒ280.71-280.74,unlesstheimplementingagency provides an extension of ìthe 12-monthtemporaryclosureperiod.Ownersandoperatorsmust completea siteassessmentinaccordancewithá280.72beforesuchan ìextensioncanbeappliedfor.       &    T    k    ß280.71    T    k  Permanent closure and changes-in-service.  äExplain280.71(a) (a)  At least 30 days before beginning either permanent closure or a      change-in-service under paragraphs (b) and (c) of this section, or within      another reasonable time period determined by the implementing agency,      owners and operators must notify the implementing agency of their intent      to permanently close or make the change-in-service, unless such action is      in response to corrective action.  The required assessment of the      excavation zone under (í280.72 must be performed after notifying the      implementing agency but before completion of the permanent closure or a      change-in-service.  àExplain280.71(b) (b)  To permanently close a tank, owners and operators must empty and      clean it by removing all liquids and accumulated sludges.  All tanks      taken out of service permanently must also be either removed from the      ground or filled it with an inert solid material.  åExplain280.71(c) (c)  Continued use of an UST system to store a non-regulated substance is      considered a change-in-service.  Before a change-in-service, owners and      operators must empty and clean the tank by removing all liquid and      accumulated sludge and conduct a site assessment in accordance with      (ó280.72.       [Note:  The following cleaning and closure procedures may be used to      comply with this section:  (A)  American Petroleum Institute Recommended Practice 1604, Removal and      Disposal of Used Underground Petroleum Storage Tanks;  (B)  American Petroleum Institute Publication 2015, Cleaning Petroleum      Storage Tanks;  (C)  American Petroleum Institute Recommended Practice 1631, Interior      Lining of Underground Storage Tanks, may be used as guidance for      compliance with this section; and  (D)  The National Institute for Occupational Safety and Health Criteria      for a Recommended StandardWorking in Confined Space may be used as      guidance for conducting safe closure procedures at some hazardous      substance tanks.] n    '    í    ó    ª    Γ280.72    í    ó    ª  Assessing the site at closure or change-in-service.  çExplain280.72(a)     ê(a)    ê  Before permanent closure or a change-in-service is completed, owners      and operators must measure for the presence of a release where      contamination is most likely to be present at the UST site.  In selecting      sample types, sample locations, and measurement methods, owners and      operators must consider the method of closure, the nature of the stored      substance, the type of backfill, the depth to ground water, and other      factors appropriate for identifying the presence of a release.  The      requirements of this section are satisfied if one of the external release      detection methods allowed in ú280.43(e) and (f) is operating in accordance with the requirements in ñ280.43 at the time of closure, and indicates no release has occurred.  êExplain280.72(b) (b)  If contaminated soils, contaminated ground water, or free product as      a liquid or vapor is discovered under paragraph (a) of this section, or      by any other manner, owners and operators must begin corrective action in      accordance with Subpart F. .    (    π280.73  Applicability to previously closed UST systems.  ëExplain280.73      When directed by the implementing agency, the owner and operator of an      UST system permanently closed before December22,1988 must assess the excavation zone and close the UST system in accordance with this Subpart if releases from the UST may, in the judgment of the implementing agency, pose a current or potential threat to human health and the environment.  t    )    X    Y    Σ280.74    X    Y  Closure records.  èExplain280.74      Owners and operators must maintain records in accordance with Ñ280.34      that are capable of demonstrating compliance with closure requirements      under this Subpart.  The results of the excavation zone assessment      required in (ª280.72 must be maintained for at least 3 years after      completion of permanent closure or change-in-service in one of the      following ways:  (a)  By the owners and operators who took the UST system out of service;      └(b)  By the current owners and operators of the UST system site; or  (c)  By mailing these records to the implementing agency if they cannot      be maintained at the closed facility. h i280.20 (a)  New tanks must be made of one of the following:  fiberglass reinforced plastic  coated steel with cathodic protection  composite  other designs approved by your UST agency.  h e 280.20 (a)  New tanks must be made of one of the following:   *fiberglass reinforced plastic  *coated steel with cathodic protection composite  *other designs approved by your UST agency.  h 280.20 (a)  New tanks must be made of one of the following:  *Fiberglass reinforced plastic(FRP); * Coated steel with cathodic protection; *Composite;or  *Other designs your UST agencyapproves.  You can use a metal tank without cathodic protection ONLYifyougetaspecialcertificationfromacorrosionexpertandkeepspecialrecordsforthelifeof thetank. h 280.22(f)  YourUSTinstallerhastocertifyonyour notificationformthattheUSThasbeen properly installed. e 280.20 (b)  New tank piping must be made of one of the following:  *Fiberglass-reinforced plastic(FRP);  *Coated steel with cathodic protection;or  *Other designs your UST agencyapproves.  You can use metal piping without cathodic protection ONLY if you get a special certification from a corrosion expert and keep special records for the life of the tank. h280.20 (c)  A new tank must be equipped to contain spills when the delivery hose is unhooked.  A new tank must prevent overfills by using one of these methods:   *An ALARM that goes off when the tank is 90% full;  *A FLOW RESTRICTOR that kicks in when the tank is 90% full;  *A device that SHUTS OFF the delivery flow when the tank is 95% full; or  *Other methodsyour UST agencyapproves. h 280.20(d)  A new UST has to be installed as directed by a national code of practice and according to the manufacturer's instructions. O 280.20(e)  You must indicate on your Notification Form that your UST has been installed properly inoneofthefollowing ways:  1. A certified installer did the work and signedthe form;  2. A professional engineer inspected theinstallation;  3. Your UST agency inspected and approved the installation;  4. Youhavefollowed the manufacturer's instructions completely; or  5.Youused any other method your UST agencyapproves. h 280.21(a)  You have until December22,1998 to meet the newor upgradedUST standardsfor corrosion protection, leak detection, andspill/overfill protection. (Or, you can close yourtank as required in Subpart G.)  [But you can't wait until the last minute--older tanks and unprotected tanks will needtomeet some of these requirements earlier.] r280.21(b)  You can upgrade a steel tank to meet thecorrosion protection rulesinany of these ways:  * Apply an interior lining;  * Install a cathodic protection system; or  * Install both a liner and a cathodic protection system. (If you do this, you won't need to do as much tank testing.)  Rememberthat there are other things you'll also needto ìdoby certain deadlines. h 280.21(c)  Your metal piping has to be upgraded with cathodic protectionormeetthestandardsfornewpiping.   280.21(d)  An upgraded UST must be equipped to contain spills when the delivery hose is unhooked.  An upgraded UST must prevent overfills by using one of these methods:   *An ALARM that goes off when the tank is 90% full;   *A FLOW RESTRICTOR that kicks in when the tank is 90% full;   *A device that SHUTS OFF the delivery flow when the tank is 95% full; or   *Other methodsyour UST agencyapproves. h  FINRES  s   280.22(a)  Within days of starting up your UST, you must use the Notification Form to describe your UST--its location, contents, and so forth--to your regulatory authority. (Appendix II identifies regulatory authorities.) A 280.22(b)  Notification Forms used in your State must meet the requirements of Section 9002 and provide the information detailed in Appendix I. A 280.22(d)  You must fill out all sections of the Notification Form for USTs started up after December22,1988.   For USTs started up earlier,onlySections I through VI need to be completed. A280.22(c)  You can use one Notification Form for more than one UST at the same location, but you havetofile separate forms for other locations. A280.22(e)  You must certify in the Notification Form that your new UST meets the following requirements:    *Installation (seeSec.280.20(e));   *Cathodic protection (see Sec.280.20(a)and(b)); * Release detection (seeSubpartD);and   *Financial responsibility (see Subpart H). a 280.43  These followingmethods of leak detectionmust beused under the conditions specified in thissection:  * Inventory control(see280.43(a)); * Manual tank gauging(see280.43(b)); * Tank tightness testing (see280.43(c)); * Automatic tank gauging (see280.43(d)); *Vapor monitoring (see280.43(e)); * Groundwater monitoring(see280.43(f)); *Interstitial monitoring(see280.43(g));and * Other methods you can prove will perform at levels acceptable to your UST agency(see280.43(h)).  * 280.22(g)  If you sell anUST for underground storage, you must tell the buyer he has to register his UST.  Use the form in Appendix III of thisrule to do this.   280.30(a)  You must make sure that there is enough room in atank  tohold the full amount of a delivery.  Also,the deliverymustbemonitoredconstantlytopreventspills or overfills.  You must report spills and overfills and clean them(See Sec. 280.53).   280.30(b)  You must report, investigate, and clean up any spills and overfills(seeSec. 280.53).   280.31(a)  You must operate and maintain your steel UST's corrosion protection continuously.  280.31(b)  You must have your corrosion protection system tested 6 months after it is first installed and every 3 years after that.  You needtokeep records of your two most recent tests.  Also,if you havean impressed-current corrosion protectionsystem it must be inspected every 2 months to makesure itis working properly.  You must keep records ofyourthree most recent inspections.   U 280.31(c)  You must have your corrosion protection system tested 6 months after it is first installed and every 3 years after that.  You needtokeep records of your two most recent tests.  Also,if you havean impressed-current corrosion protectionsystem it must be inspected every 2 months to makesure itis working properly.  You must keep records ofyourthree most recent inspections.  U 280.31(d)  You must have your corrosion protection system tested 6 months after it is first installed and every 3 years after that.  You needtokeep records of your two most recent tests.  Also,if you havean impressed-current corrosion protectionsystem it must be inspected every 2 months to makesure itis working properly.  You must keep records ofyourthree most recent inspections.  U 280.33(a)  You can repair your tank and its piping if you follow a national repaircode.    280.33(b)  FRP tanks must be repaired by someoneauthorizedbythe tank'smanufacturer,authorized repairperson, or by someone else who followsa recognized FRPrepair code. s 280.33(c)  You cannot repair damaged metal pipes or fittings. You must replace them.  You can repair FRP pipes and fittings only according to the manufacturer's specifications.  s 280.33(d)  Repaired tanks and piping must be tightness-tested within 30 days after repair UNLESS:  1. The tank is internally inspected;  2. You monitor the repaired part of the UST system monthly for leaks; or  3. You use some other test method authorized by your UST agency. o 280.33(e)  Repaired USTsthat have a cathodic protection system must be tested within 6 months of the repair to make sure the corrosion protection is working properly. (The inspections described in 280.31(b) and (c)will satisfy these tests)  o 280.33(f)  You must keep records of each repair for the life of the UST system.    280.34(a)  You havetoreport these things to your UST agency:  o The presence or installation of your tank;  oSuspected or confirmed leaks;  oSpills or overfills;  oCleanup actions you take or plantotake; and  oPlans to close your UST or to putanonregulated substance in it.  (You mustreporttheseplans before you closeyour tank.)    U 280.34(c)  You needtokeep these records on-site or where your UST agency can obtainthem:  * An expert's analysis of the corrosive potential of your site IF YOU DO NOT HAVE A CORROSION PROTECTION SYSTEM;  * Documentation of your corrosion protection system;  * Documentation of repairs;  * Documentation of your compliance with all the leakdetection requirements;and  * Results of the site investigation required to close your tank. (These records can be mailed to your UST agency and kept there.) s 280.34(b)  You needtokeep these records on-site or where your UST agency can obtainthem:  * An expert's analysis of the corrosive potential of your site IF YOU DO NOT HAVE A CORROSION PROTECTION SYSTEM;  * Documentation of your corrosion protection system;  * Documentation of repairs;  * Documentation of your compliance with all the leakdetection requirements;and  * Results of the site investigation required to close your tank. (These records can be mailed to your UST agency and kept there.) s 280.40(a)  You must have leak detection on your tank and its piping:  * You must be able to detect a leak in any part of your UST system;  * The leak detection systemmust be installed,  calibrated,maintained, and operated according to its manufacturer's instructions; and,  * The leak detection systemmust meet the performance standards set in theserules.  a 280.40(b)  If your leakdetection indicates a leak, youmust report theleak to your UST agencyfollowing theprocedures in Subpart E. o 280.40(c)  New USTs must have leak detection when they are installed.  USTs already in the ground alsomust haveleak detection by a certaindeadlinethatdependshow oldtheUSTis.Usethe"LeakDetectionAdvisor" buttonfor moredetails.  e 280.40(d)  If you don't meet the leak detection requirements by your deadline, you have to close your UST.    280.41(a) NewandupgradedUSTs must be monitored at least monthly for leaksusing:  *Automatictankgauging;  *Monitoringforvaporsinthesoil;  *Interstitialmonitoring;  *Monitoringforliquidsonthegroundwater;or  *Otherapprovedmethods.  Youhaveoneadditionalleakdetectionchoice,butONLY FOR10YEARSafteryouinstallyourUST.Inthiscase youcancombinemonthlyinventorycontrolwithtank tightnesstestingevery5years.  IfyourUSThasnotbeenupgraded,youmustcombine monthly inventory controlwithtanktightnesstestingeveryyear. e 280.41(b)  Pressurized piping must have:  * An automatic line-leak detector ;AND  *Either an annual tightness test or monthlymonitoring.  Suction piping must have:  * A tightness test every 3 years;OR  * Monthly monitoring.  Some suction piping may need no leak detection  (see 280.41(b)(2)(i - v)).  E280.42(a)  Until1998, ifyou have an existing UST that contains hazardoussubstances, it must meet at least the same  leakdetection requirements as thosefor an existing UST withpetroleum products in it. After 1998,hazardous substance USTs must have secondary containment and interstitial monitoring or youmust obtain avariance.  E 280.42(b)  New tanks and piping holding hazardous substances must have a secondary containment system with interstitialmonitoring and, for pressurizedpiping,anautomatic line-leak detector.  If you use a double-wall tank, the outer wall must be able to containanyreleasefrominsidethetank.Also,youmustbeable todetect any failureoftheinnerwall.  If you use an external liner, it must surround thetank completely ìandmustbe able to contain everything inthe largest tank in the system.Itmustalsopreventrain,snow,orgroundwaterfrominterfering with leak detection.  You can use other methods of leakdetection if you cansatisfy your UST agency that they work just as wellAND there arecleanup methods that would work atyour site on the contents of the UST system.  l 280.45 (ingeneral)  You mustkeep records of your leak detection on-site or someplacewhereyourUSTagencycangetthemonrequest.  * Manufacturer's performance claims (keep for 5 years after installation);  * Leak detection sampling, testing and monitoringresults (keepfor 1 year);  * Tank tightness test results (keep at least until your nexttest is completed);  * Records of all service to your leak detection(keep 1 year);and  * Manufacturer's calibration and maintenance schedule(keepfor5 yearsafterinstallation).  YourUSTagencymayaskyoutokeeptheserecordsforadifferent periodoftime.  pAPPLY    oLEAKDET  oLEAKDET  oLEAKDET  oLEAKDET  oLEAKDET   o USTSystemorTankSystem  "USTsystem"or"Tanksystem"meansan underground storagetank,connectedundergroundìpiping, underground ancillaryequipment,andìcontainmentsystem, ifany. p    ≤    ≈    ∙280.44  Methods of release detection for piping.  _LeakDetectionAdvisor  Each method of release detection for piping used to meet the requirements of 280.41 must be conducted in accordance with the following:  █Explain280.44(a)     °    ·(a)  Automatic line leak detectors.  Methods which alert the operator to the presence of a leak by restricting or shutting off the flow of regulatedsubstances through piping or triggering an audible or visualalarm may be usedonly if they detect leaks of 3 gallons per hour at 10 pounds per square inchline pressure within 1 hour.  An annual test of the operationoftheleakdetector must be conducted in accordance with the manufacturer's requirements.  ΦExplain280.44(b)     ⌠    ÷    √    ²     (b)  Line tightness testing.  A periodic test of piping may be conducted only if it can detect a 0.1 gallon per hour leak rate at one and one-half times the operating pressure.  ΘExplain280.44(c)     ⁿ    ■(c)  Applicable tank methods.  Any of the methods in 280.43(e)-(h) may be used if they are designed to detect a release from any portion of the underground piping that routinely contains regulated substances.  u    ⌡                    280.64  Free product removal.  δExplain280.64 At sites where investigations under  280.62(a)(6) indicate the presence of free product, owners and operators must remove free product to the maximumextent practicable as determined by the implementing agency while continuing,as necessary, any actions initiated under 280.61 through!    280.63, orpreparing for actions required under #
  39. 280.65 through$ 280.66.  In meetingtherequirements of this section, owners and operators must:  ∞Explain280.64(a) (a)  Conduct free product removal in a manner that minimizes the spread of contamination into previously uncontaminated zones by using recovery anddisposal techniques appropriate to the hydrogeologic conditions at the site,and that properly treats, discharges or disposes of recovery byproducts incompliance with applicable local, state and federal regulations;  φExplain280.64(b) (b)  Use abatement of free product migration as a minimum objective for the design of the free product removal system;  εExplain280.64(c) (c)  Handle any flammable products in a safe and competent manner to prevent fires or explosions; and  ∩Explain280.64(d) (d)  Unless directed to do otherwise by the implementing agency, prepare and submit to the implementing agency, within 45 days after confirming a release, a free product removal report that provides at least thefollowinginformation:  (1)  The name of the person(s) responsible for implementing the free product removal measures;  (2)  The estimated quantity, type, and thickness of free product observed or measured in wells, boreholes, and excavations;  (3)  The type of free product recovery system used;  (4)  Whether any discharge will take place on-site or off-site during the recovery operation and where this discharge will be located;  (5)  The type of treatment applied to, and the effluent quality expected from, any discharge;  (6)  The steps that have been or are being taken to obtain necessary permits for any discharge; and  (7)  The disposition of the recovered free product.  ,APPLY    e 280.45(a)  Keeprecordsfor5years(oraslongasyourUST agencyrequires)ofthemanufacturer'sperformance claimsforyourleakdetectionsystem.  , 280.45(b)  Keeprecordsfor1year(oraslongasyourUSTagency requires)ofleakdetectionsampling,testing,andmonitoring.However,keepresultsoftanktightness testinguntilthenexttestisconducted. , 280.45(c)  Keeprecordsfor1year(oraslongasyourUSTagency requires)ofcalibration,maintenance,andrepairof yourleakdetection.  Keepthemanufacturer'sscheduleofrequiredcalibration andmaintenancefor5yearsafterinstallationofyour leakdetection.  o 280.50(a)  QUICKLYREPORT a suspected leak to the UST agency if someone finds UST contents or vapors outside the UST in placeslikenearbysoil, basements, sewer lines or surface water.  s 280.50(b)  QUICKLYREPORT asuspectedleaktotheUSTagencyif you ìnotice unusual operation of the USTsystem,suchas ìerraticdispensing, sudden loss of product,or unexplained water in the tank.)  DO NOT REPORT if the unusual operating condition is caused by defective equipment that you can fix quickly, ìandifyoudon'tsuspectyourUSTisleaking.  o 280.50(c)  QUICKLYREPORT a leak if your leakdetection signals a leak.First check your system to make sure it's not a falsealarm.  If it's a false alarm fix your leak detectionso it works right.  DO NOT REPORT false alarms.  o 280.51  If your UST agency has evidence that your USTmight be leaking they may require you to investigatethe release.  o 280.52(a)  You have 7 days after reporting a suspected leak to test your UST and check your site forindications of leaks.  If you find a leak you mustrepair, replace or upgrade the UST.  And, you mustreport the leak and clean it up.  If you don't find a leak and there's no contamination around your site you don't have to investigate further. o 280.52(b)  You mustsample thatpartofyour site where you're most likelyto find evidence of leaks.  If you find evidence of a leak youneedtoreport it and clean up the contamination.    280.53(a)  You needtoreport your spill or overfill within 24 hours and start corrective action.  ReportaPETROLEUMspilloroverfillIF it is more than 25 gallonsOR, causes a sheen on nearby surface water. ReportaHAZARDOUS SUBSTANCEspilloroverfillIFit   exceeds the set reportablequantity for the hazardous substance.Hazardous substance spills must alsobe reportedimmediately to the National Response Center (phone1-800-424-8802 orinthe D.C. area 202-426-2675).   O 280.53(b)  If your PETROLEUM spill or overfillis less than 25 gallons, just contain it and clean itup.You do not have to report it UNLESS you can't clean itup within 24hours.  If theHAZARDOUSSUBSTANCEspilloroverfillis less than the"reportable quantity", contain it and clean it up immediately.You do not have to report it UNLESS you can't clean itup within 24 hours.  ) 280.61  If you have a confirmed leak do these things within 24 hours or as soon as your UST agency requires:  * Report the release to your UST agency.  * Stop the leak.  * Identify and control any fire, explosion or vapor hazards.    280.62(a) Unless your UST agency tells you differently, you mustdo these things to control your leak:  * Empty enough product from your UST to prevent any more leakage.  * Inspect your leak and stop it from goingany farther into soil or groundwater.  * Monitor for and prevent any fire or safety hazards innearby subsurfacestructures,suchas basements and sewers.  * Contain, treat and dispose of contaminated soil according to state and local requirements.  * Check your site for contamination where you aremost likely to ìfind evidence of a release.  Consider what was in your UST and ìthe nature of the site.  * Look for free product.  If you find any, remove it following the ìdirections in 280.64.  e 280.62(b)  Within 20 days of confirming a leak (or as soon as your UST agency requires), you mustreport toyourUSTagencywhatyou've done and what you found out about theleak.  6 280.63  You mustreport at least the following informationto your UST Agency within 45 daysofcontainingaleak:  * What and how much wasreleasedfromyour UST;  * How many people live nearby, water quality, water use, where wells are that might be affected, what kind of soil is under the surface, sewer locations, local climate and land use;  * What you found out about your leak site;and  * What you found out about free product.  Yourreportmustbetechnicallyadequateandsatisfythe requirementsofyourUSTagency.   280.65(b)  Youmustreportwhatyoufindouttoyourstate USTagencyassoonaspractical,oraccording toascheduletheyset. l 280.64(a)  Free product removal must minimize the spread of contamination by using only appropriate recovery and disposal techniques that meet the requirements of local, State, and Federal regulations.  l 280.64  Remove as much free product as you can as you start the cleanup and site check.  Make sure that you don't cause the free product to spread as you try to remove it.  Be sure you are using the right techniques.  However you treat, discharge or dispose of the free product you recover has to comply with federal, state, and local regulations.   280.64(b)  Free product removal must be designed to stop the migration of free product.   t 280.64(c)  Handle the free product so it doesn't explode or catch fire.  t 280.64(d)  You have to report removal of free product to your UST agency within 45 days.  Your report must include:  1. Who removed the free product.  2. What kind, how much and how thick was the free product found in wells, boreholes and excavations.  3. How you recovered the free product.  4. Whether you will discharge any free product (on or off your site) during recovery.  5. How you're going to treat the discharge and how much product you expect to get from it.  6. What steps you have taken to get permits for your discharges; and,  7. What you did with the free product you recovered.  o 280.65(a)  You mustinvestigate your leak, your site and the surrounding area to map out where the pollution is andhow much there is IF:  * Drinking water wells areaffected; OR,  * Free product recovery is needed; OR,  * Contaminated soils may be intouch with ground water; OR,  * Your UST agency believes your leak might contaminate surface water or ground water.  Also,youwillhavetoreporttheresultsofyour investigationtoyourUSTagency. fLEAKDET ! o 280.66(a)  After your UST agency has reviewed your initial response, site check, and cleanup, they may ask you to find out more about the extent or effects of your leak.  Or, your agency may ask you to submit a corrective action plan.  This plan spells out the details of how you will clean up the soils and ground water that your leak contaminated. Your UST agency may tell you more about when and how to submit your corrective action plan.  Your corrective action plan has to convinceyourUST agencythatyouractionswillprotect human health and the environment.  Ifnot,youwillneedtochange your plan to adquatelyprotecthuman health and the environment.  a 280.66(b) To approve your corrective action plan your UST agency must consider thefollowingfactors:  * The characteristics of what leaked; how toxic it is, how long it stays, in the environment and how fast it could spread.  * The features of the area that affect the water; where the water is, and where it's going.  * How near any water is (surface water or ground water), what it's used for now, and what it might beused for in the future.  *Howresidualcontaminationcouldaffectnearbysurface andground water;  * How many people might be exposed to how much contamination from your leak.  * All the information you have submitted to your UST agency about the leak.   280.66(d)  You can implement your corrective action plan before or after your UST agency approves it.  If youstart before your UST agency approves the plan youhave to:  * Tell the UST agency you're starting; and,  * Stop if the UST agency asks you to; and,  * Comply with any conditions the UST agency might put on your corrective action work; and,  * Include the corrective action work underway in the corrective action plan you submit to your UST agency for review.   280.67(a)  For each leak that requires a corrective action plan,your UST agencymustnotify the affected people.The UST agency can dothisbyusinglocal newspapers,public service announcements, a state register, letterstohouseholds,orpersonalcontact.    280.67(b)  Your UST agency has to make the information about the release,thesite,the corrective action plan, and decisions made about thecleanupavailable to anyone who asks to see it.  l 280.67(c)  Your UST agency MAY hold a public meeting to consider comments on yourcorrective action plan before deciding whether or nottoapproveit.  l 280.70(a)  If you temporarily shutdown your UST but don't intendto close it forever you have to:  * Operate and maintain your corrosion protection system as if your UST were in active use; AND,  * Operate your leak detection system as if your UST were in use UNLESS you can prove your tank meets theregulatorydefinition of "empty"; AND,  * Meet all the leak reporting, investigation, response, and corrective action requirements.  e 280.70(b)  If you don't use your UST for 3 months or more, you alsomustleave your vent lines open and working, andyou mustcap and secure all your lines, pumps, manways and related equipment.  m 280.70(c)  If your UST is shutdown for 12 months or more, and does not meet the standards in theserules for new or upgraded USTs (exceptforthespillandoverfill requirements),YOU HAVE TO CLOSE IT BY THE END OF THE 12TH MONTH.  If you have a special site assessment, however, you might get an extension of time to close your tank (see 280.72).  e 280.71(a)  At least 30 days before you close your UST permanently or change what you use it for you must notify your UST agency (UNLESS the closure is because of corrective action).  After notifying your UST agency and before closure or change-in-use, an assessment of the tank excavation must be performed (see 280.72).  e280.71(b)  If you close or change the use of your UST you needto empty and clean it out completely.  If you close your UST you mustremove it from the ground or fill it with an inert solid material.  o 280.71(c)  If you are going to store unregulated substances in your UST you havetoempty it, clean it out, and have your site checked for leakage from your UST before your UST agency can approve the change.  Work with them on this site assessment and report the results to them.  e 280.72(a)  Before you can permanently close your UST or use it for non-regulated substances you musthave your site checked out for evidence of leaks.  If you havegroundwater or vapor monitoring that is working properlyandindicatingnoleaks at the time yourtank is closedyoudon'tneedtocheckyour sitefurther. (See 280.43 for details.)  Otherwise,followthese basic rules in checking your sitefor leakage:  * Look for and measure for leakage where the contamination is most likely to be.  * What samples you take, and where and how you take them depend on how you close your tank, what was init, type backfill, depth to ground water and otherappropriate factors.  n 280.72(b)  If you find evidence of a leak you needtotake corrective action to clean it up(seeSubpart F).  r 280.73  If you closed your UST before December22,1988 your  USTagency can require you to check yoursite and close your UST according to 280.71and280.72 ifthey think a leakfrom your system might cause aproblem.  n 280.74  Records mustbekeptshowing yourUST was closed followingsubpartG.Arecord of the results ofthe investigation of theexcavation zone of yourUST required by 280.72mustbekeptfor3yearsafteryou closeitorchangeittoanonregulatedUST.  These records must be kept by:  * The owner or operator who closed the tank; or,  * The current owners of the UST system site; or,  * The UST agency iftherecordscannot be kept at the closed facility.  n    ºNote:Youmayusethethesearchcommand(<Ctrl>andFkey)tofindtheìagency youarelookingfor.  Appendix II - List ofAgenciesDesignatedtoReceiveNotifications              Alabama  (EPA Form)             Alabama Department of Environmental Management             Ground Water Section/Water Division             1751 Congressman W.L. Dickinson Drive             Montgomery, Alabama 36130             205/271-7823              Alaska (EPA Form)             Department of Environmental Conservation             Box O             Juneau, Alaska  99811-1800             970/465-2653              American Samoa (EPA Form)             Executive Secretary             Environmental Quality Commission             Office of the Governor             American Samoan Government             Pago Pago, American Samoa  96799             Attention:  UST Notification              Arizona (EPA Form)             Attention:  UST Coordinator             Arizona Department of Environmental Quality             Environmental Health Services             2005 N. Central             Phoenix, Arizona  85004              Arkansas (EPA Form)             Arkansas Department of PollutionControl and Ecology             P.O. Box 9583             Little Rock, Arkansas  72219             501/562-7444              California (State Form)             Executive Director             State Water Resources Control Board             P.O. Box 100             Sacramento, California  95801             916/445-1533              Colorado (EPA Form)             Section Chief             Colorado Department of Health             Waste Management Division             Underground Tank Program             4210 East 11th Avenue             Denver, Colorado  80220             303/320-8333        Connecticut (State Form)             Hazardous Materials Management Unit             Department of Environmental Protection             State Office Building             165 Capitol Avenue             Hartford, Connecticut  06106              Delaware (State Form)             Division of Air and Waste Management             Department of Natural Resources and Environmental Control             P.O. Box 1401             89 Kings Highway             Dover, Delaware  19903             302/726-5409              District of Columbia (EPA Form)             Attention:  UST Notification Form             Department of Consumer and Regulatory Affairs             Pesticides and Hazardous Waste ManagementBranch             Room 114             5010 Overlook Avenue, SW             Washington, D.C.  20032              Florida (State Form)             Florida Department of Environmental Regulation             Solid Waste Section             Twin Towers Office Building             2600 Blair Stone Road             Tallahassee, Florida  32399             904/487-4398              Georgia (EPA Form)             Georgia Department of Natural Resources             Environmental Protection Division             Underground Storage Tank Program             3420 Norman Berry Drive, 7th Floor             Hapeville, Georgia  30354             404/656-7404              Guam (State Form)             Administrator             Guam Environmental Protection Agency             P.O. Box 2999             Agana, Guam  96910             Overseas Operator (Commercial call 646-8863)        Hawaii (EPA Form)             Administrator, Hazardous Waste Program             645 Halekauwila Street             Honolulu, Hawaii  96813             808/548-2270              Idaho (EPA Form)             Underground Storage Tank Coordinator             Water Quality Bureau             Division of Environmental Quality             Idaho Department of Health and Welfare             450 W. State Street             Boise, Idaho  83720             208/334-4251              Illinois (EPA Form)             Underground Storage Tank Coordinator             Division of Fire Prevention             Office of State Fire Marshal             3150 Executive Park Drive             Springfield, Illinois  62703-4599              Indiana (EPA Form)             Underground Storage Tank Program             Office of Environmental Response             Indiana Department of EnvironmentalManagement             105 South Meridian Street             Indianapolis, Indiana  46225              Iowa (State Form)             UST Coordinator             Iowa Department of Natural Resources             Henry A. Wallace Building             900 East Grand             Des Moines, Iowa  50219             512/281-8135              Kansas (EPA Form)             Kansas Department of Health and Environment             Forbes Field, Building 740             Topeka, Kansas  66620             913/296-1594              Kentucky (State Form)             Department for Environmental Protection             Hazardous Waste Branch             Fort Boone Plaza, Building #2             18 Reilly Road             Frankfort, Kentucky  40601             501/564-6716        Louisiana (State Form)             Secretary, Louisiana Department ofEnvironmental Quality             P.O. Box 44066             Baton Rouge, Louisiana  70804             501/342-1265              Maine (State Form)             Attention:  Underground Tanks Program             Bureau of Oil and Hazardous Material Control             Department of Environmental Protection             State House - Station 17             Augusta, Maine  04333              Maryland (EPA Form)             Science and Health Advisory Group             Office of Environmental Programs             201 West Preston Street             Baltimore, Maryland  21201              Massachusetts (EPA Form)             UST Registry, Department of Public Safety             1010 Commonwealth Avenue             Boston, Massachusetts  02215             617/566-4500              Michigan (EPA Form)             Michigan Department of State Police             Fire Marshal Division             General Office Building             7150 Harris Drive             Lansing, Michigan  48913              Minnesota (State Form)             Underground Storage Tank Program             Division of Solid and Hazardous Wastes             Minnesota Pollution Control Agency             520 West Lafayette Road             St. Paul, Minnesota  55155              Mississippi (State Form)             Department of Natural Resources             Bureau of Pollution Control             Underground Storage Tank Section             P.O. Box 10385             Jackson, Mississippi 39209             601/961-5171              Missouri (EPA Form)             UST Coordinator             Missouri Department of Natural Resources             P.O. Box 176             Jefferson City, Missouri  65102             314/751-7428       Montana (EPA Form)             Solid and Hazardous Waste Bureau             Department of Health and EnvironmentalScience             Cogswell Bldg. - Room B-201             Helena, Montana  59620              Nebraska (EPA Form)             Nebraska State Fire Marshal             P.O. Box 94677             Lincoln, Nebraska  68509-4677             402/471-9465              Nevada (EPA Form)             Attention:  UST Coordinator             Division of Environmental Protection             Department of Conservation and NaturalResources             Capitol Complex 201 S. Fall Street             Carson City, Nevada  89710             800/992-0900, Ext. 4670             702/885-4670              New Hampshire (EPA Form)             NH Dept. of Environmental Services             Water Supply and Pollution Control Division             Hazen Drive             P.O. Box 95             Concord, New Hampshire 03301             Attention:  UST Registration              New Jersey (State Form)             Underground Storage Tank Coordinator             Department of Environmental Protection             Division of Water Resources (CN-029)             Trenton, New Jersey 08625             609/292-0424              New Mexico (EPA Form)             New Mexico Environmental ImprovementDivision             Groundwater/Hazardous Waste Bureau             P.O. Box 968             Santa Fe, New Mexico  87504             505/827-2933              New York (EPA Form)             Bulk Storage Section             Division of Water             Department of Environmental Conservation             50 Wolf Road, Room 326             Albany, New York  12233-0001             518/457-4351   North Carolina (EPA Form)             Division of Environmental Management             Ground-Water Operations Branch             Department of Natural Resources and Community Development             P.O. Box 27687             Raleigh, North Carolina  27611             919/733-3221              North Dakota (State Form)             Division of Hazardous Management and Special Studies             North Dakota Department of Health             Box 5520             Bismarck, North Dakota  58502-5520              Northern Mariana Islands (EPA Form)             Chief, Division of Environmental Quality             P.O. Box 1304             Commonwealth of Northern Mariana Islands             Saipan, CM  96950             Cable Address:  Gov. NMI Saipan             Overseas Operator:  6984              Ohio (State Form)             State Fire Marshal's Office             Department of Commerce             8895 E. Main Street             Reynoldsburg, Ohio  43068             State Hotline:  800/282-1927              Oklahoma (EPA Form)             Underground Storage Tank Program             Oklahoma Corporation Comm.             Jim Thorpe Building             Oklahoma City, Oklahoma  73105              Oregon (State Form)             Underground Storage Tank Program             Hazardous and Solid Waste Division             Department of Environmental Quality             811 S.W. Sixth Avenue             Portland, Oregon  98204             503/229-5788              Pennsylvania (EPA Form)             PA Department of Environmental Resources             Bureau of Water Quality Management             Ground Water Unit             9th Floor Fulton Building             P.O. Box 2063             Harrisburg, Pennsylvania  17120        Puerto Rico (EPA Form)             Director, Water Quality Control Area             Environmental Quality Board             Commonwealth of Puerto Rico             Santurce, Puerto Rico             809/725-0717              Rhode Island (EPA Form)             UST Registration             Department of Environmental Management             83 Park Street             Providence, Rhode Island  02903             401/277-2234              South Carolina (State Form)             Ground-Water Protection Division             South Carolina Department of Health and Environmental Control             2600 Bull Street             Columbia, South Carolina  29201             803/758-5213              South Dakota (EPA Form)             Office of Water Quality             Department of Water and Natural Resources             Joe Foss Building             Pierre, South Dakota  57501              Tennessee (EPA Form)             Tennessee Department of Health and Environment             Division of Superfund Underground StorageTank Section             150 Ninth Avenue, North             Nashville, Tennessee  37219-5404             615/741-0690              Texas (EPA Form)             Underground Storage Tank Program             Texas Water Commission             P.O. Box 13087             Austin, Texas  78711              Utah (EPA Form)             Division of Environmental Health             P.O. Box 45500             Salt Lake City, Utah  84145-0500        Vermont (State Form)             Underground Storage Tank Program             Vermont AEC/Waste Management Division             State Office Building             Montpelier, Vermont  05602             802/828-3395              Virginia (EPA Form)             Virginia Water Control Board             P.O. Box 11143             Richmond, Virginia  23230-1143             804/257-6685              Virgin Islands (EPA Form)             205(J) Coordinator             Division of Natural Resources Management             14 F Building 111, Watergut Homes             Christianstead, St. Croix,               Virgin Islands  00820              Washington (State Form)             Underground Storage Tank Notification             Solid and Hazardous Waste Program             Department of Ecology, M/S PV-11             Olympia, Washington  98504-8711             206/459-6316              West Virginia  (EPA Form)             Attention:  UST Notification             Solid and Hazadous Waste             Ground Water Branch             West Virginia Department of NaturalResources             1201 Greenbriar Street             Charleston, West Virginia  25311              Wisconsin (State Form)             Bureau of Petroleum Inspection             P.O. Box 7969             Madison, Wisconsin  53707             608/266-7605              Wyoming (EPA Form)             Water Quality Division             Department of Environmental Quality             Herschler Building, 4th Floor West             122 West 25th Street             Cheyenne, Wyoming 82002             307/777-7781  1        ¿Appendix III-Statement for Shipping Tickets and Invoices  Note.-A Federal law (the Resource Conservation and Recovery Act(RCRA), as amended (Pub. L. 98-616)) requires owners of certain undergroundstorage tanks to notify designated State or local agencies by May 8, 1986, ofthe existence of their tanks.  Notifications for tanks brought into useafterMay 8, 1986, must be made within 30 days.  Consult EPA's regulations, issuedìonNovember 8, 1985 (40 CFR Part 280) to determine if you are affectedbythis law.  oTELE oTELE omagictele.mag cd\smartreg magic/restart  o 280.32  Your tank and piping must be made of, orlined with, material that won't be damaged by thecontentsofthe system.    "Ancillary equipment" means any devices including, but ìnotlimited to, such devices as piping, fittings, flanges, valves,andpumpsusedtodistribute,meter,or ìcontrol the flowofregulatedsubstancestoandfromanìUST.  "Belowground release" means any release to the subsurface ìofthe land and to ground water.  This includes, but is ìnot limitedto,releasesfromthebelowgroundportionsìofanundergroundstoragetanksystemandbelowgroundìreleases associatedwithoverfillsandtransferoperations as the regulated substance moves to or from anunderground storagetank.  8, 1986, must be made within 30 days.  Consult EPA's regulations, issued on November 8, 1985 (40 CFR Part 280) to determine if you are affectedbythis law.  o "Beneath the surface of the ground" means beneath the ground surface or otherwise covered with earthen materials. o "Cathodic protection" is a technique to prevent corrosion ìofa metal surface by making that surface the cathode of ìan electrochemical cell.For example, a tank system can ìbe cathodically protected throughthe application of either galvanic anodes or impressed current.   "Cathodic protection tester" means a person who can demonstrate an understanding of the principles and measurements of all commontypesof cathodic protection systems as applied to buried or submergedmetal piping and tank systems.  At a minimum, such persons must haveeducation and experience in soil resistivity, stray current, structure-to-soil potential, and componentelectrical isolation measurements ofburied metal piping and tank systems. m "CERCLA" means the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended.   "Compatible" means the ability of two or more substances ìto maintaintheir respective physical and chemical properties upon contact withoneanother for  the design ìlife of the tank system under conditions likelytobe encountered in the UST. i"Connected piping" means all underground piping including ìvalves, elbows, joints, flanges, and flexible connectors ìattached to a tank systemthrough which regulated substancesflow.  For the purpose of determininghow muchpiping is connected to any individual UST system, the pipingthatjoinstwoUSTsystemsshouldbe allocated equallybetweenthem. i "Consumptive use" with respect to heating oil means consumed on the premises.  a "Corrosion expert" means a person who, by reason of thorough knowledge of the physical sciences and the principles of engineering and mathematics acquired by a professional education and related practical experience,ìis qualified to engage in the practice of corrosion control on buriedor submerged metal piping systems and ìmetal tanks.  Such a personmustbe accredited or certified as being qualified by the National Associationìof Corrosion Engineers or be a registered professional ìengineerwho has certification or licensing that includeseducationandexperiencein corrosion control ìof buried or submerged metal piping systemsandmetal tanks. g "Dielectric material" means a material that does not conduct direct electrical current.  Dielectric coatings are used to electricallyisolateUST systems from the surrounding soils.  Dielectric bushings areusedto electrically isolate portions of the UST system (e.g., tank frompiping). s "Electrical equipment" means underground equipment that contains dielectric fluid that is necessary for the operation of equipmentsuchas transformers and buried electrical cable.   "Excavation zone" means the volume containing the tank system and backfill material bounded by the ground surface, walls, and floorofthepit and trenches into which the UST system is placed at the timeof installation.   "Existing tank system" means a tank system used to contain an accumulation of regulated substances or for ìwhich installationhas commenced on or before December22,1988.Installation is considered to have commenced if:  (a) the owner or operator has obtained all federal, state, andlocal approvals or permits necessary to begin physical constructionofthesiteor installation of the tank system; and if, (b)(1) either a continuous on-site physical construction or installation program has begun; or, (2) the owner or operator has entered into contractual obligations--which cannot be cancelled ìor modified without substantial loss--forphysical construction at the site or installation of the tank ìsystem tobecompleted within a reasonable time. n "Farm tank" is a tank located on a tract of land devoted to theproductionof crops or raising animals, including ìfish, and associated residencesand improvements.  A farm tank must be located on the farm property."Farm" ìincludes fish hatcheries, rangeland and nurseries with growing operations. n "Flow-through process tank" is a tank that forms an integralpart of a production process through which thereis a steady, variable,recurring,or intermittent flow of materials during the operation of the process. Flow-through process tanks do not include tanks used for the storageofmaterials prior to their introduction intothe production process or forthestorageof finished products or by-products from the production process.   "Free product" refers to a regulated substance that is present as a nonaqueous phase liquid (e.g., liquid not ìdissolved in water.)   "Gathering lines" means any pipeline, equipment, facility,orbuilding used in the transportation of oil or gas during oil or gas production or gathering operations.   "Hazardous substance UST system" means an underground storage tank system that contains a hazardous substance defined in section 101(14) of the Comprehensive Environmental Response, Compensation and Liability Act of 1980(but not including any substance regulated as a hazardous waste under subtitle C) or any mixture of such substances and petroleum, and which is not a petroleum UST system.  "Heating oil" means petroleum that is No. 1, No. 2, No. 4--light,No.4--heavy, No. 5--light, No. 5--heavy, and No. 6 technicalgradesof fuel oil; other residual ìfuel oils (including Navy Special Fuel OilandBunker C); and other fuels when used as substitutes for one of thesefueloils. Heating oil is typically used in the operation of heating equipment, boilers, or furnaces.  "Hydraulic lift tank" means a tank holding hydraulic fluid for a closed-loop mechanical system that uses compressed air orhydraulicfluid to operate lifts, elevators, and other similar devices.  s "Implementing agency" means EPA, or, in the case of a state with a program approved under section 9004 (or pursuant to a memorandum of agreement with EPA), the designated state or local agency responsible for carryingout an approved UST program.  n "Liquid trap" means sumps, well cellars, and other traps used in association with oil and gas production, gathering, and extraction operations (including gas production plants), for the purposeofcollecting oil, water, and other liquids.  These liquid traps may temporarily collect liquids for subsequent disposition orreinjection into a productionor pipeline stream, or may collect and separate liquids from a gasstream.  "Maintenance" means the normal operational upkeep to prevent an underground storage tank system from releasingproduct. d "Motor fuel" means petroleum or a petroleum-based substance that is motor gasoline, aviation gasoline, No.1 or No. 2 diesel fuel, or anygradeof gasohol, and is typically used in the operation of a motor engine. d "New tank system" means a tank system that will be used tocontainan accumulation of regulated substances and for which installationhas commenced after December22, ì1988(See also "Existing Tank System.") d "Noncommercial purposes" with respect to motor fuel means not for resale.  w "On the premises where stored" with respect to heating oil meansUST systems located on the same property where the stored heatingoilisused.  d "Operational life" refers to the period beginning when installation of the tank system has commenced until the time the tank system is properly closed under Subpart G.  d "Operator" means any person in control of, or having responsibility for, the daily operation of the UST system.    "Overfill release" is a release that occurs when a tank isfilled beyond its capacity, resulting in a discharge of the regulated substancetothe environment.  d "Owner" means:  (a) in the case of an UST system in use onNovember 8, 1984, or brought into use after that date, any person who ownsanUST system  used for storage, use, or dispensing of regulated substances;and (b) in the case of any UST system in use before November 8,1984,butno longer in use on that date, any person who owned such UST immediately before the discontinuation of its use.   "Person" means an individual, trust, firm, joint stock company, federal agency, corporation, state, municipality, commission, politicalsubdivision of a state, or any interstate body.  "Person" also includes aconsortium,a joint venture, a commercial entity, and the United States Government.  l "Petroleum UST system" means an underground storage tank system that contains petroleum or a mixture of petroleum with de minimisquantitiesof other regulated substances.Such systems include those containingmotor fuels, jet fuels, distillate fuel oils, residual fuel ìoils, lubricants, petroleum solvents, and used oils.  l "Pipe" or "Piping" means a hollow cylinder or tubular conduit that is constructed of non-earthen materials.  i "Pipeline facilities (including gathering lines)" are new and existing pipe rights-of-way and any associated equipment, facilities, or buildings. d "Regulated substance" means   (a) any substance defined in section 101(14) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA)of1980 (but not including any substance regulated as a hazardous wasteunder subtitle C),and    (b)  petroleum, including crude oil or any fraction thereof that is liquid at standard conditions of temperature and pressure (60degrees Fahrenheit and 14.7 pounds per square inch absolute).  The term "regulated substance" includes but is not limited to petroleumand petroleum-based substances comprised of a complex blend of hydrocarbons derived from crude oil though processes of separation, conversion, upgrading, and finishing, suchas motor fuels, jet fuels, distillatefuel oils, residual fuel oils, lubricants, petroleum solvents, and usedoils. o "Release" means any spilling, leaking, emitting, discharging, escaping, leaching or disposing from an UST into ground water, surfacewateror subsurface soils.   "Release detection" means determining whether a release of aregulated substance has occurred from the UST system into the environmentorinto the interstitial space between the UST system and its secondarybarrierìorsecondary containment around it.  o "Repair" means to restore a tank or UST system component that has caused a release of product from the UST system. nto the environmentorinto the interstitial space between the UST system and its secondarybarrierìorsecondary containment around it.  o "Residential tank" is a tank located on property used primarily for dwelling purposes.  n "SARA" means the Superfund Amendments and Reauthorization Act of 1986. n "Septic tank" is a water-tight covered receptacle designed toreceiveor process, through liquid separation or biological digestion, the sewage discharged from a building sewer.  The effluent from suchreceptacleis distributed for disposal through the soil and settled solidsandscumfrom the tank are pumpedout periodically and hauled to a treatment facility. u "Storm-water or wastewater collection system" means piping, pumps,conduits, and any other equipment necessary to collect and transportthe flow of surface water run-off resulting from precipitation, ordomestic, commercial, or industrial wastewater to and from retention areasorany areas where treatment is designated to occur.  The collectionofstormwater and wastewater does not include treatment except where ìincidental to conveyance. u "Surface impoundment" is a natural topographic depression,man-made excavation, or diked area formed primarily of earthen materials(although it may be lined with man-made materials) that is not an injectionwell.  i "Tank" is a stationary device designed to contain an accumulation of regulated substances and constructed of non-earthen materials(e.g., concrete, steel, plastic) that provide structural support.  i "Underground area" means an underground room, such as a basement, cellar, shaft or vault, providing enough space for physical inspectionofthe exterior of the tank situated on or above the surface of thefloor.  i "Underground release" means any belowground release. r "Underground storage tank" or "UST" means any one or combination of tanks(including underground pipesconnected thereto) that isusedto contain an accumulation of regulated substances, and the volumeof which (including the volume of underground pipes connected thereto)is10 percentor more beneath the surface of the ground.  This termdoesnot include any:    (a)  Farm or residential tank of 1,100 gallons or less capacity used for storing motor fuel for noncommercial purposes; (b)  Tank used for storing heating oil for consumptive use onthepremises where stored; (c)  Septic tank; (d)  Pipeline facility (including gathering lines) regulatedunder: (1)  The Natural Gas Pipeline Safety Act of 1968 (49 U.S.C. App.1671,et seq.), or (2)  The Hazardous Liquid Pipeline Safety Act of 1979 (49 U.S.C.App. 2001, et seq.), or (3)  Which is an intrastate pipeline facility regulated under state laws comparable to the provisions of the law referred to in paragraph(d)(1)or         (d)(2) of this definition; (e)  Surface impoundment, pit, pond, or lagoon; (f)  Storm-water or wastewater collection system; (g)  Flow-through process tank; (h)  Liquid trap or associated gathering lines directly related to oil or gas production and gathering operations; or (i)  Storage tank situated in an underground area (such as abasement, cellar, mineworking, drift, shaft, or tunnel) if the storagetankissituated upon or above the surface of the floor.     The term "underground storage tank" or "UST" doesnot include any pipesconnected to any tank which is described in paragraphs(a) through (i)ofthisdefinition.  a "Upgrade" means the addition or retrofit of some systems such as cathodic protection, lining, or spill and overfill controls to improvetheabilityofan underground storage tank system to prevent the release of product.   "USTsystem"or"Tanksystem"meansanunderground storagetank,connectedundergroundpiping,underground ancillaryequipment,andcontainmentsystem,ifany.   "Wastewater treatment tank" means a tank that is designed to receive and treat an influent wastewater through physical, chemical, or biological methods.   cTELE cc 280.60  USTownersandoperatorsmustcomplywiththecorrective ìactionrequirementsofSubpartF,unlesstheirUSTsare ìidentifiedin280.10(b)orarealreadyregulatedby SubtitleC,section3004(u)ofRCRA.  IfyouthinktheseregulationsdonotapplytoyourUSTs ìusethe"ApplicabilityAdvisor"insection280.10of ìReg-In-A-Box.You mightalsocallyourstateUSTagencyìortheEPAHotlineat1-800-424-9346. ,TELE i 280.66(c)  Youmustcarryouttheapprovedcorrectiveaction planandreportonitsprogressbyfollowingthe scheduleandformatsetbytheyour USTagency.  o 280.67(d)  YourUSTagencymustgivepublicnoticeifit considersendingandunsuccessfulcorrective actionplan.  oTELE    X  .APPLY     .WHAT      ..FINRES .FINRES .FINRES    .         0    1    2    3    4    5    6Reg-in-a-Box for the PC, Version 1.1Thisversionissued3/89.  Reg-in-a-Box contains final rules publishedbyEPAOfficeof ìUndergroundStorageTanks(OUST)intheFederalRegisteron September 23, 1988 and October 26, 1988.  *  You maymakeasmanycopiesofthissoftwareasyoulikeandìdistributeit toanyonewhowouldliketouseit.  *  The Reg-in-a-Box software is not intended to provide legal advice,ìnordoes itexplaineverydetail.Ifyouhaveconcernsorquestionsnotìfully explainedherepleasecallyourstateUSTagency(seethephoneìdirectory includedhere)ortheEPA Hotlineat1-800-424-9346.  *  Use this software and the language herein as an aid tounderstanding ìOUST'sregulations, not binding OUST to any substantive interpretation ìoftheregulations which may be stated, implied or inferred from using ìthisversion ofReg-in-a-Box.    u    8 WhoReg-in-a-Boxcamefrom:  Reg-in-a-BoxwasdevelopedunderthedirectionofWilliamH. ìFoskett,U.S.E.P.A.OfficeofUndergroundStorageTanks.  Reg-in-a-Box for the PC written by Michael J. Nelson,Versar Inc.  AdvisormodulesandexplanationswerepreparedbyWilliamH. ìFoskettwiththehelpofOUSTtechnicalstaff:Stephanie ìBergman,RichardBraddock,ThomasYoungandThomasSchruben.  Testing and technical support by Michael Dorris and Suzanne ìSmidt,VersarInc.  Versar Inc. 6850 Versar Center Springfield, VA  22151 (703) 750-3000  Reg-in-a-Box for the PC was developed with a program called BlackMagic byNTERGAID, 2490 Black Rock Tpke., Fairfield, CT 06430, (203) 368-0632  aaaaaaa 280.44(a)  Automaticline-leakdetectorsmustdetect leaksof3gallonsperhourat10poundsper squareinchlinepressurewithin1hour.  Theleakdetectionequipmentmustbetestedat leastyearlyaccordingtothemanufacturer's instructions.  Yeeeeeee 280.64Dates  45 days...   Within 45 days of release confirmation, owners  and operators must prepare and submit to the   implementing agency a free product removal  report providing the following information:    1. Name(s) of the person(s) responsible for      implementing the free product removal  measures;    2. The estimated quantity, type, and thickness  of free product observed or measured in  wells, boreholes, or excavations;    3. The type of free product recovery system  used;    4. Whether any discharge will take place  onsite or offsite during the recovery  operation and where this discharge will be  located;    5. The type of treatment applied to, and the effluent quality expected from any  discharge;   6. The steps that have been or are being taken  to obtain necessary permits for any  discharge; and    7. The disposition of the recovered free  product. ynnnn 280.44(b)  Linetightnesstestingmustdetecta0.1 gallonperhourleakat1.5timesoperating pressure.  n 280.44(c)  Someofthesamemethodsusedfortankleak detection--vapormonitoring,groundwater monitoring,interstitialmonitoring,andother approvedmethods--canbeusedforpipingif theyareappropriate.   r 280.64  Removeasmuchfreeproductasyoucanasyou startthecleanupandsitecheck.  Makesurethatyoudon'tcausethefree producttospreadasyoutrytoremoveit.Be sureyouareusingtherighttechniquesand preventfiresorexplosions.  Themethodyouusetotreat,discharge,or disposeofthefreeproductyourecoverhasto complywithfederal,state,andlocal regulations.  ReportremovaloffreeproducttoyourUSTagencywithin45daysofcnformingaleak.  t 280.64(a)  Removefreeproductinawaythatminimizesthe spreadofcontaminationandthatfollowsfederal, state,andlocalregulationsforcorrectfree productremoval.  e 280.64(b)  Designfreeproductremovaltostopthe contaminationfromspreading.  e 280.64(c)  Handleflammableproductsinawaythat preventsfiresorexplosions.  e 280.64(d) YouhavetoreportremovaloffreeproducttoyourUSTagency within45daysofcontainingaleak. Yourreportmustinclude:  *Whoremovedthefreeproduct;  *Whatkind,howmuch,andhowthickwasthefree productfoundinwells,boreholes,and excavations;  *Howyourecoveredthefreeproduct;  *Whetheryouwilldischargeanyfreeproduct(onor offyoursite)duringrecovery;  *Howyou'regoingtotreatthedischargeandhow muchproductyouexpecttogetfromit;  *Whatstepsyou'vetakentogetpermitsforyour discharges;and  *Whatyoudidwiththefreeproductyourecovered.  uPREAMBLEé APPLY    APPLY            AppendixI-NotificationforUndergroundStorageTanks(Form)  Areproductionofthenotificationformpublishedwiththese ìregulationsisinthebackofthe Reg-in-a-BoxUser'sManual. uSmartRegforthePC,Version1.0,1/26/89 SmartRegisatrademarklicensedtoVersarInc.  PortionsofSmartRegweredevelopedinconjunctionwiththeU.S. ìEnvironmentalProtectionAgency(EPA)OfficeofUndergroundStorageTanks.ìVersarclaimsnocopyrightwithrespecttothetextoftheregulationsorthe ì"plainEnglish"explanations,bothofwhichweredevelopedbyEPA.  Thiscomputersoftwareisnotintendedtoprovidelegaladvice.Youshould ìseeksuchadvicefromaqualifiedattorney.      SummaryofSmartRegCommands  <PgDn> key-Goestonextscreen.  <PgUp>key-Returnstopreviousscreen.  Arrowkeys-Movescurser.  <F1>key-Displaysinformation,referenceortextlink-up.Movecurserbetweentriangleordiamondsymbolsandpress<F1>.Youmaypressthe<F1>keyany numberoftimesaslongastherearelinks.  <Esc>key-Returnstopreviousororiginalscreen.Youmay pressthe<Esc>keyatanytimeafteryouhavepressedthe<F1>keyonceormultipletimesto returntothepreviousscreenorscreens.  <Ctrl>F,<Enter>-Findaword,numberorphrase.Pressthe<Ctrl> andtheFkeyatthesametime,thenattheprompt typeinwhatyouwanttosearchfor.Pressthe<Enter>key.Programwillfindthefirstinstance ofwherethatwordorphraseoccurs.(See<Ctrl>A)  <Ctrl>A-Findsthenextoccuranceofthesamewordorphrase.        Afteryouhavepressed<Ctrl>F,press<Ctrl>A. <Alt><F10>-ExitfromSmartReg.Pressthe<Alt>andthe<F10> keyatthesametime.ProgramwillaskifyouwanttoleaveaBookMarktoreturntothesametextwhen younextuseSmartReg.  VersarInc.6850VersarCenter Springfield,VA22151 (703)750-3000  Fortechnicalsupportcall:(703)750-3000extension269.   r    The"plainEnglish"explanationsforthefinancialresponsibilitysectionareìcurrentlyunderdevelopmentatEPAOfficeofUndergroundStorageTanks.When ìthisinformationbecomesavailableitwillbeincorporatedintotheSmartReg ìpackage.AnupdatedversionofSmartReg,includingthefinancial ìresponsibilitysection,willbesenttoyouinthenextfewweeks. eBasic Reg-in-a-Box Commands                     [PressPgDntoseemore]  Movecursorto"activeareas".Press the <Ctrl> and --> or<--keyor<--ìkeysto skip the cursor from one "button"to thenextone. View informationbehindan"activearea".  Put the cursor between triangle or ìdiamond symbols and press the <F1>key.  Backtrackorputawayinformation.  Use the <ESC> key tobacktrackthroughìtheReg-in-a-Box screens.  Findawordorphrase.Press the <Ctrl> and F keys to displayasearchìdialogbox.  Typeinyourwordor phraseandpressthe<ENTER>key. Searchforthesamewordorphraseagain.Press the<Ctrl> and A keys to find ìthe nextoccurenceof thesame word or phrase.  Printthetextyou'relookingat.Pressthe<Ctrl>andPkeystoprintthe ìtextoftheparticularsection,explanation,document,etc.thatyou'rein.  Exporttexttoyourwordprocessor.Pressthe<Ctrl>andEkeysandgive yourìwordprocessor'sfilepathandafilenameattheprompt.  Exit Reg-in-a-Box.  Press the <Alt> and <F10> keys.  Answer"Y"if you want to ìreturn to the sameplacenexttimeyouuseReg-in-a-Box.  Moveforwardanotherscreenfuloftext.  Movebackwardanotherscreenfuloftext.  -->and<-- keys  -  Moves cursor up, down, right or left(onespaceatatime).  <Alt> <F1>        -  Press the <Alt> and <F1> keys to return to the top                      level of Reg-in-a-Box.         280.22  You havetoregister your UST with your StateUST agency if you began using it after May 8, 1986.  For tanks installed after September23,1988, youneedtocertifythat the tank was properly installedand meets technical standards.  Also, you must submitproof that you meet the financial ìresponsibilityrequirements.  REMEMBER:  IfyourtankwasusedanytimebeforeJanuary1,1974, ìyouaresupposedtohaveregistereditwithyourState ìUSTagency.And,ifyouusedsuchatankafterJanuary ì1,1974,andhavesincestoppedusingit,youmustalso ìnotifyyourStateUSTagencyofthattoo.   t