home *** CD-ROM | disk | FTP | other *** search
/ Liren Large Software Subsidy 13 / 13.iso / p / p069 / 4.img / TUTD.LIF / DE#-02-I.01 < prev    next >
Encoding:
Text File  |  1990-12-06  |  476 b   |  15 lines

  1. The next step is to transform the circle to the bottom
  2. of the Finger Guide, creating a drill hole through the
  3. center.
  4.  
  5. The plane of the angled surface and that of the bottom 
  6. of the part are not parallel. To correctly transform
  7. the circle, choose X-FORM, PROJECT, SKEWED, JOIN, SINGLE.
  8.  
  9. A SKEWED projection direction means that the circle is 
  10. projected to a plane that is not parallel to the plane
  11. of the angled surface, but rather to a plane that you
  12. define.
  13.  
  14.  
  15.