home *** CD-ROM | disk | FTP | other *** search
/ NetNews Usenet Archive 1992 #31 / NN_1992_31.iso / spool / sci / space / news / 2731 < prev    next >
Encoding:
Text File  |  1992-12-28  |  2.1 KB  |  47 lines

  1. Newsgroups: sci.space.news
  2. Path: sparky!uunet!elroy.jpl.nasa.gov!ames!dont-send-mail-to-path-lines
  3. From: baalke@kelvin.jpl.nasa.gov (Ron Baalke)
  4. Subject: Galileo Update - 12/28/92
  5. Message-ID: <1992Dec28.184813.14724@news.arc.nasa.gov>
  6. Followup-To: sci.space
  7. News-Software: VAX/VMS VNEWS 1.41    
  8. Keywords:  Galileo, JPL
  9. Sender: news@elroy.jpl.nasa.gov (Usenet)
  10. Nntp-Posting-Host: kelvin.jpl.nasa.gov
  11. Organization: Jet Propulsion Laboratory
  12. Date: Mon, 28 Dec 1992 18:47:00 GMT
  13. Approved: sci-space-news@ames.arc.nasa.gov
  14. Lines: 31
  15.  
  16. Forwarded from Bill O'Neil, Galileo Project Manager
  17.  
  18.                             GALILEO STATUS REPORT
  19.                               December 28, 1992
  20.  
  21.      The Galileo Spacecraft is operating normally in the dual-spin mode and
  22. is transmitting coded telemetry at 1200 bps (bits/second).
  23.  
  24.      Over the holiday period from Wednesday through Sunday, minimal spacecraft
  25. activity was scheduled.  Tracking was scheduled over DSS-14 (Goldstone 70 meter
  26. antenna), DSS-43 (Canberra 70 meter antenna), DSS-61 (Madrid 34 meter antenna)
  27. and DSS-63 (Madrid 70 meter antenna).
  28.  
  29.      Today, December 28, 1992, the HGA (High Gain Antenna) warming to a 45
  30. degree off Sun angle is scheduled in preparation for the DDA-5 (Dual Drive
  31. Actuator #5) windup hammering activities.  Real-time commands are scheduled
  32. to update the system fault protection response and to modify attitude control
  33. fault protection precision level in support of the motor acuation activity.
  34. Tracking is scheduled over DSS-43 and DSS-63.
  35.  
  36.      Tomorrow, after approxiamately 28 hours at warming attitude, real-time
  37. motor windup hammering commands are scheduled to be sent beginning at approx
  38. 6:56 AM PST for a period of up to 20 hours.  Tracking is scheduled over DSS-14,
  39. DSS-43 and DSS-63.
  40.      ___    _____     ___
  41.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  42.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  43.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Choose a job you love, and
  44. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | you'll never have to work
  45. |_____|/  |_|/       |_____|/                     | a day in your life. 
  46.  
  47.