home *** CD-ROM | disk | FTP | other *** search
/ NetNews Usenet Archive 1992 #31 / NN_1992_31.iso / spool / sci / space / news / 2728 < prev    next >
Encoding:
Text File  |  1992-12-28  |  4.1 KB  |  79 lines

  1. Newsgroups: sci.space.news
  2. Path: sparky!uunet!spool.mu.edu!agate!ames!dont-send-mail-to-path-lines
  3. From: lang@unb.ca (Richard Langley)
  4. Subject: Navstar GPS Constellation Status (92-12-28)
  5. Message-ID: <ID3577.D921228.T112336.lang@unb.ca>
  6. To: sci-space-news@uunet.UU.NET
  7. Followup-To: sci.space
  8. Sender: daemon@cs.utexas.edu
  9. Organization: CS Dept, University of Texas at Austin
  10. Date: Mon, 28 Dec 1992 15:25:07 GMT
  11. Approved: sci-space-news@ames.arc.nasa.gov
  12. Lines: 65
  13.  
  14.  
  15.                         Navstar GPS Constellation Status
  16.                                    (92-12-28)
  17.  
  18. Blk                       NASA   Orbit   Launch
  19. II        PRN Internat. Catalog  Plane    Date
  20. Seq   SVN Code   ID      Number  Pos'n    (UT)   Clock  Available/Decommissioned
  21. --------------------------------------------------------------------------------
  22. Block I
  23.        1   4  1978-020A  10684          78-02-22        78-03-29     85-07-17
  24.        2   7  1978-047A  10893          78-05-13        78-07-14     81-07-16
  25.        3   6  1978-093A  11054          78-10-06        78-11-13     92-05-18
  26.        4   8  1978-112A  11141          78-12-10        79-01-08     89-10-14
  27.        5   5  1980-011A  11690          80-02-09        80-02-27     83-11-28
  28.        6   9  1980-032A  11783          80-04-26        80-05-16     91-03-06
  29.        7                                81-12-18        Launch failure
  30.        8  11  1983-072A  14189    C-3   83-07-14   Rb   83-08-10
  31.        9  13  1984-059A  15039    C-1   84-06-13   Cs   84-07-19
  32.       10  12  1984-097A  15271    A-1   84-09-08   Rb   84-10-03
  33.       11   3  1985-093A  16129    C-4   85-10-09   Rb   85-10-30
  34.  
  35. Block II
  36. II-1  14  14  1989-013A  19802    E-1   89-02-14   Cs   89-04-15
  37. II-2  13   2  1989-044A  20061    B-3   89-06-10   Cs   89-08-10
  38. II-3  16  16  1989-064A  20185    E-3   89-08-18   Cs   89-10-14
  39. II-4  19  19  1989-085A  20302    A-4   89-10-21   Cs   89-11-23
  40. II-5  17  17  1989-097A  20361    D-3   89-12-11   Cs   90-01-06
  41. II-6  18  18  1990-008A  20452    F-3   90-01-24   Cs   90-02-14 22:26 UT
  42. II-7  20  20  1990-025A  20533    B-2   90-03-26   Cs   90-04-18 23:13 UT
  43. II-8  21  21  1990-068A  20724    E-2   90-08-02   Cs   90-08-22 15:00 UT
  44. II-9  15  15  1990-088A  20830    D-2   90-10-01   Cs   90-10-15 00:39 UT
  45.  
  46. Block IIA
  47. II-10 23  23  1990-103A  20959    E-4   90-11-26   Cs   90-12-10 23:45 UT
  48. II-11 24  24  1991-047A  21552    D-1   91-07-04   Cs   91-08-30 04:44 UT
  49. II-12 25  25  1992-009A  21890    A-2   92-02-23   Rb   92-03-24 11:00 UT
  50. II-13 28  28  1992-019A  21930    C-2   92-04-10   Cs   92-04-25 20:32 UT
  51. II-14 26  26  1992-039A  22014    F-2   92-07-07   Cs   92-07-23 19:43 UT
  52. II-15 27  27  1992-058A  22108    A-3   92-09-09   Cs   92-09-30 20:08 UT
  53. II-16 32  32  1992-079A  22231    F-1   92-11-22   Cs   92-12-11 14:49 UT
  54. II-17 29  29  1992-089A  22275    F-4   92-12-18        expected 93-01-08
  55.  
  56. Notes
  57. 1.  NASA Catalog Number is also known as NORAD or U.S. Space Command object
  58.     number.
  59. 2.  No orbital plane position = satellite no longer operational.
  60. 3.  Clock:  Rb = Rubidium; Cs = Cesium
  61. 4.  PRN 3 is operating on Rb clock without temperature control.
  62. 5.  PRN 12 clock switched from Cs to Rb on 6 February 1992.
  63. 6.  PRN 11 clock switched from Cs to Rb on 4 April 1992.
  64. 7.  PRN 11 clock switch to last rubidium during 7 days beginning 29 September
  65.     1992.
  66. 8.  PRN 14 suffered failure of its operational Cs clock on 29 August 1992.
  67.     Satellite operating on second Cs clock by 1 September 1992.
  68. 9.  The power supplies of PRN 11 and 13 have insufficient capacity to maintain
  69.     L1/L2 transmissions during eclipse season.  During this period, the L1/L2
  70.     transmissions of PRN 11 and 13 may be turned off for up to 12 hours a day.
  71.  
  72. ==============================================================================
  73.  Richard B. Langley                        Internet: LANG@UNB.CA or SE@UNB.CA
  74.  Geodetic Research Laboratory              BITnet:   LANG@UNB or SE@UNB
  75.  Dept. of Surveying Engineering            Phone:    (506) 453-5142
  76.  University of New Brunswick               FAX:      (506) 453-4943
  77.  Fredericton, N.B., Canada  E3B 5A3        Telex:    014-46202
  78. ==============================================================================
  79.