home *** CD-ROM | disk | FTP | other *** search
/ NetNews Usenet Archive 1992 #31 / NN_1992_31.iso / spool / sci / space / news / 2726 < prev    next >
Encoding:
Text File  |  1992-12-28  |  2.1 KB  |  50 lines

  1. Newsgroups: sci.space.news
  2. Path: sparky!uunet!spool.mu.edu!agate!ames!dont-send-mail-to-path-lines
  3. From: baalke@kelvin.jpl.nasa.gov (Ron Baalke)
  4. Subject: Mars Observer Update - 12/22/92
  5. Message-ID: <1992Dec28.073029.16386@news.arc.nasa.gov>
  6. Followup-To: sci.space
  7. News-Software: VAX/VMS VNEWS 1.3-4   
  8. Keywords:  Mars Observer, JPL
  9. Sender: news@elroy.jpl.nasa.gov (Usenet)
  10. Nntp-Posting-Host: kelvin.jpl.nasa.gov
  11. Reply-To: baalke@kelvin.jpl.nasa.gov
  12. Organization: Jet Propulsion Laboratory
  13. Date: Mon, 28 Dec 1992 15:29:00 GMT
  14. Approved: sci-space-news@ames.arc.nasa.gov
  15. Lines: 33
  16.  
  17. Forwarded from the Mars Observer Project
  18.  
  19.                 MARS OBSERVER STATUS REPORT
  20.                     December 22, 1992
  21.  
  22. The C5A sequence continues to clock out and the C5B
  23. sequence is being readied for early January uplink, pending
  24. final confirmation of the date for transition to outer cruise
  25. attitude.
  26.  
  27. The SCT has successfully loaded the I + 89 star catalogs and
  28. ephemeris updates and the spacecraft is collecting stars while
  29. in the Sun Star Init mode.  The spacecraft will be commanded
  30. back to the  Array Normal Spin mode this afternoon.
  31.  
  32. The spacecraft is expected to be placed in the outer cruise
  33. configuration in early January, which positions the spacecraft
  34. HGA (High Gain Antenna) and solar array towards earth.  Following
  35. transition to outer cruise, the HGA will be activated.  Following a
  36. short calibration period, the HGA will then be utilized throughout
  37. the rest of the mission for nominal operations.  Until this
  38. transition point, the spacecraft will remain very inactive, with
  39. only star catalog updates planned.
  40.  
  41. The spacecraft engineering elements and payload instruments
  42. continue to perform well, and within specification.
  43.      ___    _____     ___
  44.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  45.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  46.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Choose a job you love, and
  47. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | you'll never have to work
  48. |_____|/  |_|/       |_____|/                     | a day in your life. 
  49.  
  50.