home *** CD-ROM | disk | FTP | other *** search
- Newsgroups: sci.space.news
- Path: sparky!uunet!spool.mu.edu!agate!ames!dont-send-mail-to-path-lines
- From: baalke@kelvin.jpl.nasa.gov (Ron Baalke)
- Subject: Galileo Update - 12/22/92
- Message-ID: <1992Dec28.072202.15508@news.arc.nasa.gov>
- Followup-To: sci.space
- News-Software: VAX/VMS VNEWS 1.3-4
- Keywords: Galileo, JPL
- Sender: news@elroy.jpl.nasa.gov (Usenet)
- Nntp-Posting-Host: kelvin.jpl.nasa.gov
- Reply-To: baalke@kelvin.jpl.nasa.gov
- Organization: Jet Propulsion Laboratory
- Date: Mon, 28 Dec 1992 15:20:38 GMT
- Approved: sci-space-news@ames.arc.nasa.gov
- Lines: 26
-
- Forwarded from Bill O'Neil, Galileo Project Manager
-
- GALILEO STATUS REPORT
- December 22, 1992
-
- The Galileo Spacecraft is operating normally in the dual-spin mode and
- is transmitting coded telemetry at 1200 bps (bits/second).
-
- Yesterday, minimal spacecraft activity was scheduled. Continuous
- tracking was scheduled over DSS-14, DSS-43 DSS-61 and DSS-63.
-
- Today, December 22, 1992, the DDA-5 (Dual Drive Actuator) part A sequence
- memory load is being uplinked. This sequence covers HGA (High Gain Antenna)
- warming turn and the motor actuation activities from December 28, 1992 through
- January 4, 1993. Continuous tracking is scheduled over DSS-12, DSS-43 and
- DSS-61.
-
- Over the holiday period, minimal spacecraft activity is scheduled.
- Tracking is scheduled over DSS-14, DSS-43, DSS-61 and DSS-63.
- ___ _____ ___
- /_ /| /____/ \ /_ /| Ron Baalke | baalke@kelvin.jpl.nasa.gov
- | | | | __ \ /| | | | Jet Propulsion Lab |
- ___| | | | |__) |/ | | |__ M/S 525-3684 Telos | Choose a job you love, and
- /___| | | | ___/ | |/__ /| Pasadena, CA 91109 | you'll never have to work
- |_____|/ |_|/ |_____|/ | a day in your life.
-
-