home *** CD-ROM | disk | FTP | other *** search
/ NetNews Usenet Archive 1992 #31 / NN_1992_31.iso / spool / sci / space / 18287 < prev    next >
Encoding:
Internet Message Format  |  1992-12-28  |  2.1 KB

  1. Xref: sparky sci.space:18287 sci.astro:13452 alt.sci.planetary:440
  2. Newsgroups: sci.space,sci.astro,alt.sci.planetary
  3. Path: sparky!uunet!elroy.jpl.nasa.gov!kelvin.jpl.nasa.gov!baalke
  4. From: baalke@kelvin.jpl.nasa.gov (Ron Baalke)
  5. Subject: Mars Observer Update - 12/22/92
  6. Message-ID: <1992Dec28.073050.16410@elroy.jpl.nasa.gov>
  7. News-Software: VAX/VMS VNEWS 1.3-4   
  8. Keywords:  Mars Observer, JPL
  9. Sender: news@elroy.jpl.nasa.gov (Usenet)
  10. Nntp-Posting-Host: kelvin.jpl.nasa.gov
  11. Reply-To: baalke@kelvin.jpl.nasa.gov
  12. Organization: Jet Propulsion Laboratory
  13. Date: Mon, 28 Dec 1992 15:29:39 GMT
  14. Lines: 33
  15.  
  16. Forwarded from the Mars Observer Project
  17.  
  18.                 MARS OBSERVER STATUS REPORT
  19.                     December 22, 1992
  20.  
  21. The C5A sequence continues to clock out and the C5B
  22. sequence is being readied for early January uplink, pending
  23. final confirmation of the date for transition to outer cruise
  24. attitude.
  25.  
  26. The SCT has successfully loaded the I + 89 star catalogs and
  27. ephemeris updates and the spacecraft is collecting stars while
  28. in the Sun Star Init mode.  The spacecraft will be commanded
  29. back to the  Array Normal Spin mode this afternoon.
  30.  
  31. The spacecraft is expected to be placed in the outer cruise
  32. configuration in early January, which positions the spacecraft
  33. HGA (High Gain Antenna) and solar array towards earth.  Following
  34. transition to outer cruise, the HGA will be activated.  Following a
  35. short calibration period, the HGA will then be utilized throughout
  36. the rest of the mission for nominal operations.  Until this
  37. transition point, the spacecraft will remain very inactive, with
  38. only star catalog updates planned.
  39.  
  40. The spacecraft engineering elements and payload instruments
  41. continue to perform well, and within specification.
  42.      ___    _____     ___
  43.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  44.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  45.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Choose a job you love, and
  46. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | you'll never have to work
  47. |_____|/  |_|/       |_____|/                     | a day in your life. 
  48.  
  49.