home *** CD-ROM | disk | FTP | other *** search
/ NetNews Usenet Archive 1992 #27 / NN_1992_27.iso / spool / sci / space / 16195 < prev    next >
Encoding:
Internet Message Format  |  1992-11-20  |  2.3 KB

  1. Xref: sparky sci.space:16195 sci.astro:12260 alt.sci.planetary:342
  2. Newsgroups: sci.space,sci.astro,alt.sci.planetary
  3. Path: sparky!uunet!zaphod.mps.ohio-state.edu!cs.utexas.edu!swrinde!elroy.jpl.nasa.gov!kelvin.jpl.nasa.gov!baalke
  4. From: baalke@kelvin.jpl.nasa.gov (Ron Baalke)
  5. Subject: Magellan Update - 11/20/92
  6. Message-ID: <1992Nov20.232659.8134@elroy.jpl.nasa.gov>
  7. News-Software: VAX/VMS VNEWS 1.3-4   
  8. Keywords:  Magellan, JPL
  9. Sender: news@elroy.jpl.nasa.gov (Usenet)
  10. Nntp-Posting-Host: kelvin.jpl.nasa.gov
  11. Reply-To: baalke@kelvin.jpl.nasa.gov
  12. Organization: Jet Propulsion Laboratory
  13. Date: Sat, 21 Nov 1992 07:26:54 GMT
  14. Lines: 36
  15.  
  16. Forwarded from the Magellan Project
  17.  
  18.                      MAGELLAN STATUS REPORT
  19.                        November 20, 1992
  20.  
  21. 1.   Magellan continues to operate normally, performing a
  22.      starcal (star calibration) and desat (desaturation of
  23.      the reaction wheels) on each orbit and transmitting a
  24.      carrier plus 40 bps X-band signal.
  25.  
  26. 2.   The spacecraft has completed 6136 orbits of Venus; 500 so
  27.      far in Cycle 4, which will end on May 25, 1993.
  28.  
  29. 3.   Tuesday, November 17, the project conducted a design
  30.      review of an aerobraking experiment to be conducted at
  31.      the end of Cycle 4.  Preliminary modeling of dynamic
  32.      pressures, temperatures and attitude control indicate
  33.      that circularizing the orbit on an aerobraking plan which
  34.      proceeds aggressively for the first several weeks, and
  35.      backs off in the later stages, appears to be very
  36.      feasible.
  37.  
  38. 4.   A Spacecraft Team Technical Interchange Meeting (TIM) was
  39.      held on Thursday.  The spacecraft performance has been
  40.      excellent since the last TIM although there have been 12
  41.      TWTA (Traveling Wave Tube Ampilfier) SSOs (Spurious Shutoffs),
  42.      including five on Tuesday, and there has been some increase
  43.      in the slippage of the Solar Array Drive Mechanism since the
  44.      end of the apoapsis occultation season.
  45.      ___    _____     ___
  46.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  47.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  48.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Learn to recognize the
  49. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | inconsequential, then 
  50. |_____|/  |_|/       |_____|/                     | ignore it.
  51.  
  52.