I recall a case in Florida where a construction company used Lotus 123 to estimate a job, got the bid, and found that the bid was too low. They found that the
employee who used Lotus had incorrect formulas; it was something like she summedrows A thru M, where shee needed A thru N.
Theyt sued Lotus Dev. Corp, who, I think, was absolved.