home *** CD-ROM | disk | FTP | other *** search
/ Software Du Jour / SoftwareDuJour.iso / BUSINESS / LOTUS / TUTDOC1.ARC / 3315.PRN < prev    next >
Encoding:
Text File  |  1985-02-25  |  1.0 KB  |  38 lines

  1.  
  2. Problem  You enter 5 variables (unit sales, price, price erosion rate,
  3.          unit cost, variable cost learning rate, and total fixed costs)
  4.          and this worksheet produces a 100 period breakeven analysis
  5.          that is conducize to graphic analysis.
  6.  
  7. Block Diagram
  8.                ___________________
  9.               |                   |
  10.               |  Input area       |
  11.               |                   |
  12.               |-------------------|
  13.               |                   |
  14.               |  Breakeven        |
  15.               |  Analysis         |
  16.               |                   |
  17.               |                   |
  18.               |                   |
  19.               |-------------------|
  20.  
  21. Tips
  22.          Good model design that maximizes "what-if" potential.
  23.  
  24.          Window split vertically slowing down scroll speed.
  25.          Fix by clearing windows (/wwc) and issuing Titles command
  26.          (/wtb) at cell B19.
  27.  
  28.  
  29.  
  30.  
  31.  
  32.  
  33.  
  34.  
  35.  
  36.  
  37.  
  38.