Prev.   Contents   Next Net Vampire 3.0 User's Manual


Scheduling

Job Start Time
When a new Job is added, its start time is set according to the Pre-Processing / Start setting in the System Settings dialog. You can change the start time of the Job on the General tab page of the Job Settings dialog.

Click the Wait speedbutton to instruct the Job to start on schedule.
Click the Start speedbutton to start the Job immediately.

Start Job Regularly
This option is useful for file change tracking. Enable it on the Advanced tab page of the Job Settings dialog and set the polling interval. Two additional options, Download only newer files and Preserve All Files, allow you to specify whether you want to have only the latest version of the file or keep the full history of file changes.

HINT: This option can be used in combination with the Ignore file time change option for incremental downloads of permanently growing files, such as web server logs.

Shut Down and Power Off
can be enabled or disabled in the Start/Stop Settings dialog.

NOTE: Not all computers support the Power-Off feature.

Windows NT 4.0 users please read the Microsoft Knowledge Base article #Q140779



Prev.   Contents   Next Net Vampire 3.0 User's Manual